1 / 7

Waste and failure demand

Waste and failure demand. Lean Conference, University of St. Andrews November 2010. Muri, mura, muda. Mura = unevenness, fluctuation, variation. Muri = overburden. No Muri, Mura or Muda. Muda = waste. 7 Manufacturing Wastes. Movement. Transportation. Over Processing. Over production.

jackie
Télécharger la présentation

Waste and failure demand

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Waste and failure demand Lean Conference, University of St. Andrews November 2010

  2. Muri, mura, muda Mura = unevenness, fluctuation, variation Muri = overburden No Muri, Mura or Muda Muda = waste

  3. 7 Manufacturing Wastes Movement Transportation Over Processing Over production Inventory Defects Waiting

  4. 7 Service Wastes Duplication Movement Opportunity lost Errors Unclear communication Inventory Delay

  5. Failure Demand • Failure Demand: The demand caused by a failure to do something or not do something right for the customer

  6. Failure Demand • “Fire fighting” • Creates ‘noise’ in the system • False idea about what customer demand is • Damages customer value • Overloads our staff • Creates a negative organisational culture

  7. Contact Us Address: Lean University Team Cardiff University McKenzie House 30-36 Newport Road Cardiff CF24 0DE Website: www.cardiff.ac.uk/lean Email: Lean@cardiff.ac.uk Tel: 02920 870737

More Related