An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Westshore Terminals Presentation to EMA 20 Feb 2014 David Crook P.Eng. Manager, Engineering and Environmental Services Westshore Terminals LP

  2. Our evolution ●Opened 1970 as single pad ●Doubled size in 1983-84 ●New single dumper 1992

  3. Westshore export coal types 40% energy coal 60% steelmaking coal

  4. South Korea No. 1 Shipments by destination

  5. Over 700 million tonnes shipped in our 43 years December 6th, 2012

  6. Compensation Habit Created by PortMetroVan

  7. December 7th, 2012

  8. Berth 1 trestle 7 Dec 2012

  9. Land-side stabilization and clean-up

  10. Berth 1 trestle - salvage

  11. Marine life on recovered pilings and debris

  12. Controlled blasting was used to separate the road deck from pile caps

  13. Berth 1 - salvage - road deck

  14. Preparations to receive coal via suction dredge

  15. Berth 1 trestle Reconstruction

  16. Trestle reconstructed in two months

  17. Business as usual

  18. Railcars sprayed with binder at mine load-out

  19. Rail-Car Unloading By Rotary Dumper

  20. Water sprays in the Dumper Pit Railcar washing after unloading

  21. Rail mounted Stacker-Reclaimers Stockpiling and Reclaiming

  22. Big Bertha Dust suppression □ 94 ground level rain guns □ 10 high mast sprays □ 17 tower sprays (Big Berthas) □ fleet of 3 water trucks

  23. Water spray towers Enhanced site coverage

  24. 94 low level rain-gun sprays

  25. Dust suppression Other methods Water Trucks spray and wash Coal roads compacted and MgCl

  26. Putting it all together

  27. Off-site Mobile Air Monitoring Unit

  28. Emissions Reduction - vehicle replacement to upgrade engine Tier status (MetroVan Off-road Diesel Emissions Reduction Program) - anti-idling program - more efficient operations (reduction in bulldozing)

  29. Switching to LED Lighting • Energy Saving - 60w v. 400w • Long Life - up to12 years • Daylight comparable white light • Directional - limits spilled light • No on/off strike delay Energy savings with PowerSmart • Switching to VFD Motor Control

  30. Existing Development

  31. Future development

  32. Thank you WestshoreTerminals