40 likes | 196 Vues
WiMax Status @ UCLA. Giovanni Pau UCLA gpau@cs.ucla.edu. Status. Connection to L2 Infrastructure Done, tested and Connected. 2 Clients made available to Community through OMF/OML Installation of the Airspan BST Location selected (Top o Spraul Hall) Pole Installed On Hold for
E N D
WiMax Status @ UCLA Giovanni Pau UCLA gpau@cs.ucla.edu
Status • Connection to L2 Infrastructure • Done, tested and Connected. • 2 Clients made available to Community through OMF/OML • Installation of the Airspan BST • Location selected (Top o Spraul Hall) • Pole Installed • On Hold for • Power Supply • Network (we may go wireless on that) • Station is Operational in the LAB for the WimaxRF testing • FCC Related • Renewed Experimental License • Coordination with Clear Started GTTI Cagliari
Status • WimaxRF for Airspan • Barebone functionalities are being finalized • Node Authorization • Measurements from BS per client • Advanced Functionality (year 2) • Handoff Support • Handoff Application • Experiments • Experiments with Telktonica/NEC for coverage and performance are planned by end of 2012. • Experiment with Telktonica/Airspan will be performed as soon as the Airpsan is up. GTTI Cagliari
Thanks Questions?