1 / 4

WiMax Status @ UCLA

WiMax Status @ UCLA. Giovanni Pau UCLA gpau@cs.ucla.edu. Status. Connection to L2 Infrastructure Done, tested and Connected. 2 Clients made available to Community through OMF/OML Installation of the Airspan BST Location selected (Top o Spraul Hall) Pole Installed On Hold for

javen
Télécharger la présentation

WiMax Status @ UCLA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WiMax Status @ UCLA Giovanni Pau UCLA gpau@cs.ucla.edu

  2. Status • Connection to L2 Infrastructure • Done, tested and Connected. • 2 Clients made available to Community through OMF/OML • Installation of the Airspan BST • Location selected (Top o Spraul Hall) • Pole Installed • On Hold for • Power Supply • Network (we may go wireless on that) • Station is Operational in the LAB for the WimaxRF testing • FCC Related • Renewed Experimental License • Coordination with Clear Started GTTI Cagliari

  3. Status • WimaxRF for Airspan • Barebone functionalities are being finalized • Node Authorization • Measurements from BS per client • Advanced Functionality (year 2) • Handoff Support • Handoff Application • Experiments • Experiments with Telktonica/NEC for coverage and performance are planned by end of 2012. • Experiment with Telktonica/Airspan will be performed as soon as the Airpsan is up. GTTI Cagliari

  4. Thanks Questions?

More Related