Participate in our energy efficiency challenges from April to July to earn points for your hospital! Complete the designated forms by the deadlines each month to accumulate points: April focuses on Energy Star Ratings, May emphasizes LED lighting controls, June targets boiler upgrades, and July involves retro-commissioning tasks. Each challenge rewards participation, with additional points for signatures from VPs. Ensure your submissions are for heat-cooled spaces only to qualify. Join us in enhancing hospital efficiency and compete for district recognition!
E N D
District 1 – Team Name 30* 80% =24
District 2 – Team Name 20 * 80% = 16
District 3 – Team Name 17* 80% = 14
District 4 – Team Name 12 * 80% = 10
April’s Challenge COMPLETE this FORM and Return it to me By April 25 Your Hospital Earns 250 pts …..Sheet completed except ESR150 pts …..Energy Star Rating & shared with ASHE400 pts …..Hospital TOTAL District Earns Total Hospital Scores (80% # District)
Only use Hospital ft2 that is connected to the meters reported below NO – Parking Decks NO – Roofs ONLY- Heat/Cooled Spaces
Meter and Cost data should be for the hospital ONLY if possible
May’s Challenge Complete ONE of the following- Lighting- LED-Lighting Controls and Return it to me By May 30th Your Hospital Earns 150 pts …..completing the form 50 pts….. having VPs signature District Earns Total Hospital Scores (80% # District)
June’s Challenge • Complete ONE of the following- Boiler Replacement-Reduce CFM • - Reduce Outside Air • Free Cooling • - VFD • and • Return it to me • By • June 27th • Your Hospital Earns • 150 pts …..completing the form 50 pts….. having VPs signature • District Earns • Total Hospital Scores • (80% # District)
Low to NO cost items “Low Hanging Fruit” July’s Challenge Complete ONE of the following- RetroCx Worksheet and Return it to me By July 25th Your Hospital Earns 150 pts …..completing the form 50 pts….. having VPs signature District Earns Total Hospital Scores (80% # District) Must actually complete this work • Retro Commissioning • Calibration of controls • Return to working order (ie – repair leaking hot water reheat valve) • Improve staging of chillers • Reduce static pressure drop- ???? Your idea (not already covered) For technical help, call your design engineer, one of the RCx in our association or Joel.
To Win - requires: • Participation • Participation • Participation