An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hall A RC report X>2 & SRC May3rd– May 10th, 2011 Xiaohui Zhan Argonne National Lab

  2. May 3rd – May 8th : x>2 • May 3rd (Tue.): • Continue production at Kin 3.1 (L) and Kin 6.5 (R). • Proceed to Kin 4.2 after beam study, smooth production. • CODA crash, right Q1 tripped once but recovered soon. • Network problem for LeCroy HV IOC. • Fixed the R-HRS movement issue. • May 4th (Wed.): • Production at Kin 4.2. • Bull’s eye scan, proceed to Kin 4.1. • Change to Kin 5.05 • IOC values & Dipole NMR problem.

  3. May 5th (Thu.): • Beam study, access to move BB spectrometer for the prepare of SRC. • Change to Kin 5.0, put sieve in for optics. Preliminary analysis shows sieve hole on right arm (distorted optics due to Q3) • Sieve out and continue production at Kin 5.2. • No major issues. • May 6th (Fri.): • Finish production at Kin 5.2. • Change to Kin 3.1 and finish. • Change to Kin 6.5 (last setting). • HRS magnet control frozen. • NMR lock issue.

  4. May 7th – 8th (Sat. – Sun.): • Continue production at Kin 6.5 • CODA rate issue due to loose trigger cable.

  5. SRC • May 8th (Sun.): • Switch over to SRC from 10am. • Beam pass change: 3->4 • Target warm/Configuration change • HAND/BB cosmics tests • Slanted Carbon run to check doubles • Low current BPM/BCM test over night (ALEX) • Target Vacuum problem.

  6. May 9th (Mon.): • Beam study • Target change/cool down (4He/LD). • Set kinematics L-HRS 3.61GeV/c, R-HRS 1.196 GeV/c • Left Q1 polarity stuck when trying to ramp it up after the target cool down. • R-HRS timing shifts by 60ns, investigation on going… • May 10th (Tue.): • MCC shifts Thursday’s beam study to today (9am – 1pm), both halls have magnets problem. • Controlled access for techs to fix left Q1 • R-HRS timing investigation continues(?)

  7. Plan before beam down • Spectrometer pointing with optics ~0.5 hr. • More carbon data ~1hr to check detectors. • 20 cm 4He with 4uA: check and production. Many thanks to: Howard, Heidi, Jack, Dave, Alex, Bob, …