Chapter 3 Master test planning
Introduction • Test planning is key to successful software testing • Largely omitted due to time constraints, lack of training, cultural bias • A test schedule is not a test plan !! • Usually measured by number of test cases run
Levels of test planning • Master test plan; orchestrates testing at all levels • Unit • Integration • System • Acceptance • Others are alpha, beta, customer acceptance, build, string, development
Importance of test planning • Goal is to deal with the important issues of testing • Strategy • Resource utilization • Responsibilities • Risks • Priorities • Process is more important than the document
Audience analysis • Audience for a unit test plan is a lot different than the audience for a system test plan • Different tolerances for what will be read
Activity timing • Test planning should be started as soon as possible • Same time as requirements specs and project plan are being developed • Could have significant impact on the project plan • Use TBD’s !!
Standard templates • Important to have a template • IEEE Std 829-1998 for Software Test Documentation • Customize as necessary • Strive to improve usability over time
Test plan identifier Table of contents References Glossary Introduction Test items Software risk issues Features to be tested Features not to be tested Approach Item pass/fail criteria Suspension criteria and resumption requirements Test deliverables Testing tasks Environmental needs Responsibilities Staffing, training, schedule, risks IEEE test plan template
1.0 Test Plan Identifier • Keep track of most current version • Use CM • Must be kept up to date ! • No “post-implementation” test planning!
2.0 Table of Contents • List each topic in the plan • References • Glossaries • Appendices • Reader can use to quickly review topics of interest
Introduction or Scope • Scope of the project • Scope of the plan • Master test plan may cover the entire project (embedded system) or may be many MTPs for a project
Test items • Describes programmatically what should be tested • Oriented to the level of the test plan • Must reference requirements spec, design spec, user’s guide, operations guide, etc
Risk issues section • Used to determine what the primary focus of testing should be • Hard to test everything in a given release • Software risks that drive testing • Interfaces to other systems • Modules with a history of defects • Security, performance, reliability SW • Features difficult to change or test
Features to be tested • What to be tested from a customer point of view (as opposed to test items -> viewpoint of the developer) • May help determine which features can be removed
Features not to be tested • Some features do not need to be tested • Not changed • Not available for use • Used to reduce risk by raising awareness • Can help you attain additional resources • May grow if project falls behind
Approach/strategy section • Description of how testing will be performed (approach) • Explain any issues that have a major impact on the success of testing and the project (strategy) • Include entry and exit criteria for each level of testing
Methodology decisions • “off the shelf” methodology or create your own • How many testers and when? • How many beta sites? • Testing techniques? • Testing levels? • Environment becomes more realistic the higher you go
Model for testing testing function function mapping oracle test grammar statistical theoretic rules and usage sequence testing with model creation enumeration usage models fully specified and compiled code no operational * field static unit profiles data analysis test ? * code inspection yes * correctness run time verification unit test code * tools (lint) analysis * code coverage * leak detectors * oracle compare * instrumentation
Test Data/ Results Automating the Testing Process Software Test Station Test Sequences Control and Sequencing of Script Script SW Modeling tool Random test case generator Test scripting software Test station control software Output Data/ Responses Usage Models Control Output Data/ Responses Crafted Test Cases Software Under Test Data Output Data/ Results Expected Results Test results verification Certification team Oracle
Resources • Best laid plans can be ruined • Development running late (testers wait) • Ship date moved forward • Testing schedule should contain contingencies • Finding testing resources is a strategy decision • Can also become a political issue
Test coverage decisions • Several types of coverage • Code coverage • Requirements coverage • Design and interfaces • Model coverage
Walkthroughs and inspections • Reviews of requirements, design, code, etc is an important verification technique • Complementary activities to testing • Walkthrough; peer review • Inspection; formal evaluation technique
Configuration management • Describes how CM should be handled during testing • Change management • Process for reviewing, prioritizing, fixing, and re-testing bugs • Tradeoff between fixing too many bugs and freezing code too early • Use a CCB
Collection and validation of metrics • Metrics collection and validation can be a significant overhead • What metrics to collect? • What will they be used for? • How will they be validated? • Need a way to measure testing status, effectiveness, quality, etc
Tools and automation • Testing tools can be a big advantage but, if not used correctly, can also be a disadvantage • May take more time than manual • Regression may take less time • Use of testing tools should be well planned (plan for training and integration)
Changes to the test plan • Include all the key stakeholders in development and review cycles • Small changes may not have to go through approval cycle • How often to update (weekly, monthly) • How should the plan be reviewed?
Meetings and communication • Standard meetings should be described here • CCB • Presentations to users and management • Status reporting guidelines • Chains of command for conflict resolution
Other strategy issues • Multiple production environments • Beta testing • Test environment setup and maintenance • Use of contractual support • Unknown quality of software • Feature creep
Items pass/fail criteria • Each item has to have an expected result • Test cases passed and failed • Number • Type • Severity and location of bugs • Usability • Reliability and stability • All test cases not created equal
Suspension criteria and resumption requirements • Conditions that warrant temporary suspension of testing • Sometimes continuing on can be wasted effort • Metrics can be used to flag these conditions • Testing may be halted if a certain number of bugs are found
Test deliverables • List of documents, tools, other components to be developed and maintained • Test plans • Design specs • Test cases • Custom tools • Defect reports • simulators
Testing tasks • Identifies the set of tasks necessary to prepare for and perform testing • Intertask dependencies and any special skills
Environmental needs • Hardware, software, data, interfaces, facilities, publications, security access pertaining to the testing effort • Attempt to configure testing environment similar to real world if possible • Where will the data come from?
Responsibilities • Define major responsibilities • Establishment of test environment • CM • Unit testing • Putting a name next to a task helps to get it done !!
Staffing and training needs • Number and type of people required depend on the scope • Various training needs • Tools • Methodologies • Management systems (defects) • Basic business knowledge
Schedule • Testing schedule should be built around milestones in the project plan • Milestones built around major events • Initial generic schedule is useful (no dates) • Plan for risks and contingencies • Record the schedule (audit trail)