1 / 30

Passive Spectrum Use and Upcoming Changes in the Spectrum Environment

Passive Spectrum Use and Upcoming Changes in the Spectrum Environment. by Chris van Diepenbeek Radiocommunications Agency Netherlands. Concerns about:. Commercial pressure SRR in 24 GHz UWB Cognitive Radio, Software Defined Radio Flexibility What can Spectrum Managers do ?

jennis
Télécharger la présentation

Passive Spectrum Use and Upcoming Changes in the Spectrum Environment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Passive Spectrum Use and Upcoming Changes in the Spectrum Environment by Chris van Diepenbeek Radiocommunications Agency Netherlands

  2. Concerns about: • Commercial pressure • SRR in 24 GHz • UWB • Cognitive Radio, Software Defined Radio • Flexibility • What can Spectrum Managers do ? • What can Radio Astronomers do ? 2 RFI2010, March 29-31 2010 Groningen

  3. Spectrum environment Worldwide Europe, 48 National (NL) Europe, 27 3

  4. Radio Regulations Radio Astronomers and the Radio Regulations • Article 5: Table of Allocations • 5.340: All emissions are prohibited in the following bands:………………….. • except for 5.422, 5.483 and 5.511. • these exceptions are geographical limited • 5.149: administrations are urged to take all practicable steps to protect radio astronomy from harmful interference…. • Various ITU-R Recommendations 4 RFI2010, March 29-31 2010 Groningen

  5. ITU-R: some simple questions • WP 7D: Radio Astronomy • TG 1/8: Short Range Radar Ultra Wide Band • WP 1A: Spectrum above 275 GHz • WP 1B: Cognitive Radio, Software Defined Radio • WP 1B: Flexibility 5 RFI2010, March 29-31 2010 Groningen

  6. CEPT Composition: • 48 Member States (decisions based on consensus) • EC + EFTA Counsellors • Observers: • International Governmental Organizations of States: on their own right • European Telecom, Industry and Science Organisations: reciprocal MoU / LoU 6 RFI2010, March 29-31 2010 Groningen

  7. CEPT: Electronic Communications Committee (ECC) Electronic Communications means: transmission, and, where applicable, switching or routing, which permits the conveyance of signals by wire, radio, optical or other electromagnetic means, irrespective of the type of information conveyed. 7 RFI2010, March 29-31 2010 Groningen

  8. ECC Mission • Common policies and regulations • Harmonize the efficient use of the radio spectrum, satellite orbits and numbering resource • Promote interest of Europe on a world-wide basis 8 RFI2010, March 29-31 2010 Groningen

  9. Com ECC ECC Decisions important measures for harmonization commitment to implement Recommendations ECC and CEPT Reports All: Public consultation CPG & Com ITU ECPs: European Common Proposals to ITU Briefs: Reasons, background Views on other proposals. CPG documents freely accessible CEPT Deliverables 9 RFI2010, March 29-31 2010 Groningen

  10. The ECC and Radio Astronomers ECC has an LoU with ESF (CRAF) • Allows member participation at PT level and organisation representation at WG or Plenary Four possibilities for you to influence the ECC: • Participate as observer • Participate in national delegation • Comment during consultations < www.ero.dk > • Do all ! 10 RFI2010, March 29-31 2010 Groningen

  11. European Commission Radio Spectrum Policy Group (RSPG) • Advises Commission: • Opinions on issues such as Digital Dividend, Streamlining Regulations, Collective Use of Spectrum, Secondary Trading, etc. • Draft Opinions are subject to a public consultation • Published on < http://rspg.groups.eu.int > • You all can react ! 11 RFI2010, March 29-31 2010 Groningen

  12. RSPG Opinion 6:A coordinated EU Spectrum approach for Scientific Use of Radio Spectrum, 25-10-’06. Objective: improve recognition Conclusions: • Considerable societal value • Incommensurable in financial terms • Intergovernmental commitments is a European priority • Exclusive allocations only for a limited portion of spectrum • If sharing (for non 5.340 bands): impact on both services shall be assessed. 12 RFI2010, March 29-31 2010 Groningen

  13. Opinion 6 and WRC agenda 8.1.1 item C • Director ITU-R to Report on sector activities related to Resolution 673 (WRC-07): Radiocommunications Use for Earth observations applications: • Its objective: improve recognition • Res 673 has no word about Radio Astronomy • In ITU-R we develop the Report about the essential role of observations (EESS etc. and RAS/SRS); • Sections on RAS had a slow start • Shall we change from Science to Observation Services? 13 RFI2010, March 29-31 2010 Groningen

  14. RSPG Opinion 12:Best Practices Regarding the Use of Spectrum by Some Public Sectors,11-2-’09 • Focuses on Defense, Emergency and Public Safety, and Public Transport • Multiple approaches: • Document the rights of use by public sector bodies; • Determine needs via ex-ante detailed audit; • Apply a “justification procedure”; • public sector bodies have to submit a detailed explanation of their spectrum requirements. • Also: acquire service from the market, introduce spectrum pricing etc. 14 RFI2010, March 29-31 2010 Groningen

  15. Netherlands (1) • Change in Telecommunication Law • Public Spectrum Users have to justify their needs on a regular basis: • Also Science Services have to submit every 3 years a plan containing their justified needs. 15 RFI2010, March 29-31 2010 Groningen

  16. Netherlands (2) Minister of Education and Science to specify: Purpose and legal basis for public use use, Organisation to use, Inventory of required spectrum, Time, location, conditions for use, Further information my be requested by the Telecom Minister. What about proposing this in an ITU-R Report or Recommendation? 16 RFI2010, March 29-31 2010 Groningen

  17. European Commission: Radio Spectrum Committee (RSC) Composed by 27 EU members; consensus preferred, weighted voting • EC Decisions: implementation is obligatory • CEPT Reports (and ECC Decisions) as a basis. • No Public consultation • For you: Lobby administrations or EC Influence the ECC Report 17 RFI2010, March 29-31 2010 Groningen

  18. EC Decisions:related to the internal market electronic communications, transport, and R &D UWB: - ECC/DEC/(06)12 amended - ECC/DEC/(07)01 (Material sensing) - 2007/131/EC SRR: - ECC/DEC(04)03 (77-81 GHz) - ECC/Dec(04)10 amended (24 GHz temporarily) - 2004/545/EC (77-81 GHz) - 2005/50/EC (24 GHz temporarily) < www.ero.dk > <http://ec.europa.eu/information_society/policy/ecomm/radio_spectrum > 18 RFI2010, March 29-31 2010 Groningen

  19. ECC: Short Range Radar in 24 GHz • Permanent in US, • Interim on 24 GHz in Europe; the European Regulation to protect Radio Astronomy is not enforceable. • No take-off could lead to prolongation of interim regulations • Future band: still considerable disagreement in CEPT. • Prolong on limited period in 24 GHz, and move to 77-81 GHz • Allow 10 %, or limited period in band 26 -29 GHz and move to 77-81 GHz. • Interference ? 19 RFI2010, March 29-31 2010 Groningen

  20. ECC: Short Range Radar in 24 GHz CEPT Report 36 on 24 GHz • put on hold, awaiting final decision on 26 GHz • Provisional Conclusion: “Finally, simply by taking into account the constraints resulting from coexistence between SRR 24 GHz and EESS, FS & Radio Astronomy, CEPT can conclude that existing regulation for SRR 24 GHz systems should in principle be kept without substantial changes” (max. 7 % , or mid 2013). 20 RFI2010, March 29-31 2010 Groningen

  21. ECC: Short Range Radar in 24 GHz CEPT Report 37 on 26 GHz band: • In Public Consultation • All: as soon as possible to 77 - 81 GHz • 11 Admin’s against use of 26 GHz • 2 Admin’s prolong use 24 GHz under stringent commitment of car industry • Express your views ! 21 RFI2010, March 29-31 2010 Groningen

  22. CPG: Cognitive Radio, Software Defined Radio • No definitions in the Radio Regulations • Any radio system may implement SDR/CRS techniques within any radiocommunication service as long as it operates in accordance with the provisions of the RR applicable for that specific service in the related frequency band. • Frequencies or frequency bands (tuning range) for specific applications could be harmonized, as necessary, on world wide basis in ITU-R Recommendations or regionally. • No regulatory actions would be required for SDR . 22 RFI2010, March 29-31 2010 Groningen

  23. CPG: Cognitive Radio, Software Defined Radio Deployment scenarios: • If all systems in a certain band have CRS capabilities: CRS can share on a primary basis. • In case of sharing in a band with systems not having CRS capability: CRS use is secondary to the use of the service having primary allocation. Conclusion: • There is no need to exclude Radio astronomy bands. 23 RFI2010, March 29-31 2010 Groningen

  24. Other views: Cognitive and Software Radio • No change to RR’s with a WRC Resolution providing guidance for further studies; • No future agenda item; • No change to RR’s with a WRC Resolution dealing with the use of Cognitive Radio, further studies within ITU-R; • Exclusion of Radio Astronomy and others until studies are finished 24 RFI2010, March 29-31 2010 Groningen

  25. CPG: Flexibility (Resolution 951) • Increase flexibility in RR while ensuring compatibility between services: allocations to be done in the broadest possible way under provisions to ensure technological neutrality where possible. • Include only issues which have an international implication in the Radio Regulations • Use of a frequency band is decided at national or regional level, in accordance with the Radio Regulations, noting that some use is international, or has international implications • Develop a WRC Resolution on principles for enhancing the international spectrum regulatory framework. 25 RFI2010, March 29-31 2010 Groningen

  26. CPG: Flexibility • Current trend towards convergence of applications within different services; • Regulations have to keep pace with developments, while ensuring effective and efficient use of spectrum allowing operation to be free of harmful interference; • Decisions to modify the Radio regulations may take a period of 4-8 years, sometimes even more. 26 RFI2010, March 29-31 2010 Groningen

  27. ITU-R: Flexibility Convergence Fixed - Mobile: • Do as we have done always: every WRC • Modify definitions in Article 1 to make a clear difference: • at motion or at unspecified location is mobile; • Fixed receiver at specified point or at any point within a specified area is Fixed Service. • CEPT: Licensing will protect RAS 27 RFI2010, March 29-31 2010 Groningen

  28. ITU-R: Flexibility General Allocation Issues: • 2 views: • RR’s and WRC’s provide the means to meet requirements of the future; • Allocate bands to the most broadly defined service; allocate on a worldwide basis taking into account safety, technical, operational, economical factors 28 RFI2010, March 29-31 2010 Groningen

  29. Flexibility for Radio Astronomy ? • In Article 5 there are 20 frequency bands allocated to both EESS (passive), Radio Astronomy and SRS (passive). • What about a flexible allocation to: Observation Service (passive)? 29 RFI2010, March 29-31 2010 Groningen

  30. To conclude: • Look a little bit less to the universe, • Look a little bit more to the spectrum ! • Thank you 30

More Related