1 / 14

Jean-Pierre LOUBINOUX, Director General

VI International Rail Salon of Engineering and Technologies “Establishment of International Railway Standards for economic development and innovation for 1520 system” Moscow, Shcherbinka test loop , 12 September 2013. Jean-Pierre LOUBINOUX, Director General.

Télécharger la présentation

Jean-Pierre LOUBINOUX, Director General

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VI International Rail Salon of Engineering and Technologies “Establishment of International Railway Standards for economic development and innovation for 1520 system”Moscow, Shcherbinka test loop, 12 September 2013 Jean-Pierre LOUBINOUX, Director General

  2. A SUSTAINED RAILWAY SECTOR DYNAMIC • . More members: + 100 new /year 2009 • > 230 members • . More technical deliverables: > 500 live leaflets (standards) • Projects & deliverables, including R&D • > 90 seminars & conferences /worldwide greater audience • . More global • With a specific developments on UIC role on dissemination & promotion of railway solutions and railway standards • With better integration of the different regions thanks to dedicated partnerships with members and international organisations Jean-Pierre Loubinoux - IRSs for the development of the 1520 System - 12.9.2013

  3. UIC Standardisation Platform Why? • Initiated in December 2012 • Missions: • Definition of detailed strategies on standardisation implementing the guidelines given from UIC members • Increase the value of the UIC Leaflets defining their evolution: International Railway Standards and Joint Standards • Coordination of standardisation activities to be developed by the different UIC Forums • Establishment of proper agreements with the other Standardisation Institutions Jean-Pierre Loubinoux - IRSs for the development of the 1520 System - 12.9.2013

  4. What? – Covered Activities Rail System Forum System View & Production Strategy Strategy of Standardisation Passenger Forum Clusters Freight Forum Contributions High Speed Freight Corridors ……….. ........ …… …… TSI IRS xx Guidelines on Standardisation IRS xy IRS yx High Speed Systems IRS yy Application Europe JS ww UIC wx UIC zz Standardisation 1520 UIC Leaflets (plus UPDATING) Agreements ... International Railway Standards ERA TermOfReference ISO IEC Joint Standards (UIC-IEC, UIC-ISO, ..) Jean-Pierre Loubinoux - IRSs for the development of the 1520 System - 12.9.2013

  5. UIC Standardisation Strategy Standardisation Targets Highlights Balance and optimise resources, targets and innovation. Real opportunity for cooperation and integration of best practices and outcomes and processes. Development of UIC standardisation based on an increased and solid consensus. International Railway Standards written by the Railway Operating Community:enter in the new era of the Railway System. Assert and progress in the complementarity principle with regard to other standardisation organisations. Jean-Pierre Loubinoux - IRSs for the development of the 1520 System - 12.9.2013

  6. UIC Standardisation Strategy INTERNATIONAL RAILWAY STANDARDS UIC IRS100421 Xxxxxxxxxxxxxxxxxxx x xxx  An IRS consists of: • A Common Part: that contains all the elements agreed by everybody.. • Several optional Specific Parts: each of them, is mandatory only for a specific service or geographic application. UIC International Railway Standard (IRS) EU ASIA XX … Jean-Pierre Loubinoux - IRSs for the development of the 1520 System - 12.9.2013 6

  7. UIC Standardisation Strategy The clusters are coordinated sets of norms addressed to standardise the pre-competitive items of the railway applications. CLUSTER of Specifications – System Focus Sustainability • demanded level of service • boundary conditions • transportation problem • available systems • CLUSTER Cluster A ClusterHigh Speed Cluster B Performances Cluster FreightCorridors First examples Freight Corridors High Speed Functionalities UIC IRSs, leaflet or otherapplicableStandards Jean-Pierre Loubinoux - IRSs for the development of the 1520 System - 12.9.2013 7

  8. UIC Standardisation Strategy The International Railway Standards offer an efficient possibility to the development of standards for the 1520mm OSJD system. The redaction of IRSs allows to make immediately available new, existing or under development OSJD standards into suitable documents. The concrete results now available allows working simultaneously on the different systems according to the various needed situations. APPLICATION: 1520mmsYSTEM Easiness in merging different standards Dynamically growing Common Part Rapid Special Part exploitation Jean-Pierre Loubinoux - IRSs for the development of the 1520 System - 12.9.2013 8

  9. UIC Standardisation Strategy IRS N. 2013_01 Today (30.07.2013) • Tomorrow (31.07.2013) Cover Pages 2 - xx POSSIBLE FIELDS OF INTEGRATION IN 1520: UIC + OSJD + GOST IRS N. 2013_01 UIC Code 541-3 International Railway Standard Series 1 - Number 2013_01 International Railway Standard Series 1 - Number 2013_01 UIC Code 541-3 ---------------------------------------------------------------------------Existing common requirements (from UIC Code 541-3 and GOST 1203-75 )-------------------------------------------------------------- Rolling Stock - Brake Components Brakes - Disc brakes and their application - General conditions for the approval of brake pads Version 1.0 Rolling Stock - Brake Components EU Part OSJD Part GOST 1203-75 ---------------------------------------------------------------------------Requirements from UIC Code 541-3 not in pages 2-xx -------------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------- Requirements from GOST 1203-75 not in pages 2-xx ------------------------------------------------------------------------------------------------ …. Version 1.0 Jean-Pierre Loubinoux - IRSs for the development of the 1520 System - 12.9.2013 9

  10. UIC Standardisation Strategy POSSIBLE FIELDS OF INTEGRATION: Tsi and reglaments UIC REGLAMENTS PROJECTS TSI Scope expansion REGLAMENTS …… …… …… IRS n. XXXX ROLLING STOCK IRS n. YYYY FIXED INSTALLATIONS • RS • ENE 1435 1520 1435 1520 …. …. RS 201407 RS 201408 Jean-Pierre Loubinoux - IRSs for the development of the 1520 System - 12.9.2013 10

  11. UIC Standardisation Strategy NOW - Updating of UIC leaflets • 120 Leaflets to be updated in IRS format in 5 years, i.e. 24 on average per year. • 20 leaflets in 2013 : • -> 14 on Rolling Stock Sector, • -> 2 on Energy Sector, • -> 3 on Infrastructure • -> 1 on Passengers • A strong governance to manage the process has been put in place. Jean-Pierre Loubinoux - IRSs for the development of the 1520 System - 12.9.2013 11

  12. Standardisation Platform VISION • Unification of Railway Operating Rules and maintenance • Railway Operating Rules will be IRSs defining the human operations connected to the railway system and its interfaces, at a worldwide level as a condition for design of the next generation of railway transports. • Transverse characteristics and applications of the railway system Men (organisation, skills, education, culture…) Environment (economical and safety targets, traffic, track possession politic…) Rules (operation rules, laws, technical directives, track possession management…) Infrastructure (track, signalling, overhead lines, monitoring…) Rolling stock (speed, load, aerodynamics, acceleration, monitoring…) Jean-Pierre Loubinoux - IRSs for the development of the 1520 System - 12.9.2013 12

  13. Standardisation Platform Action Plan • HOW? • Encourage continuous improvement of UIC standards as irreplaceable to operate the railway service. • Endorse the clusters’ concepts and support the implementation of the proposed ones ( freight corridors, High Speed, etc.). • Carry out the IRS concept, with first examples with all stakeholders in the most suitable format : • -> Partnering with regulation bodies: OSJD, CRT, IEC, … -> Partnering with standard issuing members; CARS (China), VNIIZhT (Russia), RTRI (Japan), … Jean-Pierre Loubinoux - IRSs for the development of the 1520 System - 12.9.2013 13

  14. Thankyou for yourkind attention Jean-Pierre Loubinoux cau@uic.org Jean-Pierre Loubinoux - IRSs for the development of the 1520 System - 12.9.2013

More Related