1 / 19

Chapter 6 Urban Land Rent

Chapter 6 Urban Land Rent. Introduction to Land Rent. Market value: amount paid to take ownership Land rent: periodic payment from user to owner. Introduction to Land Rent. WTP for hectare of land = Total revenue - non-land costs Bid rent per hectare = WTP divided by lot size.

joanna
Télécharger la présentation

Chapter 6 Urban Land Rent

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 6 Urban Land Rent

  2. Introduction to Land Rent • Market value: amount paid to take ownership • Land rent: periodic payment from user to owner

  3. Introduction to Land Rent • WTP for hectare of land = Total revenue - non-land costs • Bid rent per hectare = WTP divided by lot size

  4. Bid Rent curves for the manufacturing sector • WTP: Maximum amount for lot large enough for production facility • WTP = Total revenue - non-land costs • One part of non-land cost is cost of freight to highway • Bid rent per hectare = WTP divided by lot size

  5. Axiom 1: Price of land adjusts for locational equilibrium • Each firm earns zero economic profit after paying for land • Variation in freight cost are exactly offset by variation in land rent

  6. Bid Rent curves for the information sector • Office firms gather, process, and distribute information → incentive to cluster • Principle of median location: Travel distance minimized at median location • Total travel distance increases at increasing rate as distance to center increases

  7. Office Bid Rent curve with a fixed lot size(without Factor Substitution) • WTP = Total Revenue - non-land costs • One part of non-land cost is travel costs of office workers • Bid rent per hectare = WTP / size of production site

  8. Office Bid-Rent curve with Factor Substitution • Capital and land are input substitutes in production of office space • Building up increases capital cost and decreases land cost • Capital costs increase with building height • Vertical transportation systems • Reinforcement for weight bearing

  9. Choosing a Building Height • Which point of the isoquant minimizes the building cost. • Lets continue our example (table 6-5) adding land rent. • Will see how as land price ↑ firms will substitute Land for K.

  10. Low Rent ($40): Short building is least costly Medium Rent ($200): Medium building is least costly High Rent ($1600): Tall building is least costly Choosing a Building Height

  11. Office Bid Rent with Factor Substitution • WTP = Total Revenue - non-land costs • One part of non-land cost is travel costs of office workers • Bid rent per hectare = WTP / size of production site

  12. Without factor substitution we get a concave Bid-Rent curve. • With factor substitution we get a convex Bid-Rent curve

  13. Moving Closer to the Center • Move from 5 blocks from center to 1 block from center • Point e. Four story building (efficient). Bid-Rent = $200. • Savings in travel cost: point e to point a; ∆ Bid = $656 • Savings from factor substitution: point a to j; ∆Bid = $744 • Result: ∆ Bid rent exceeds the decrease in travel cost

  14. Moving Farther from the Center • Move from 5 blocks away from center to site farther away • Increase in travel cost decreases bid rent • Factor substitution saves cost and increases bid rent • Result: ∆ Bid rent is less than the increase in travel cost

More Related