Dynamo Team 2 Careful Harry Conceptual Design Review

Fall 2011 Rev A. Dynamo Team 2 Careful Harry Conceptual Design Review. Glenda Alvarenga J.J. Busse Emily Eggers Adam Kemp Gabrielle Massone Dalton Smith Corey Wilson September 20, 2011. Presentation Overview. Mission Overview Design Organizational Chart Schedule Budget

johnna
Télécharger la présentation

Dynamo Team 2 Careful Harry Conceptual Design Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fall 2011 Rev A DynamoTeam 2 Careful HarryConceptual Design Review Glenda Alvarenga J.J. Busse Emily Eggers Adam Kemp Gabrielle Massone Dalton Smith Corey Wilson September 20, 2011

  2. Presentation Overview • Mission Overview • Design • Organizational Chart • Schedule • Budget • Design Concerns

  3. Mission Overview • OBJECTIVE • To investigate high altitude power generation using the kinetic motion of the balloon and a generator based on the parabolic curve of a pendulum • Most turbulent parts of flight will produce more electric voltage and current • To capture video and images from space • EXPERIMENT POTENTIAL: • Provide means for alternative source of energy and power • Information on kinetic energy during flight indirectly indicates mechanical stress, influencing future structures • Getting back memorable pictures and video

  4. Design Overview

  5. KINETIC ENERGY GENERATOR (K.E.G) • Primary payload of Dynamo • Parabolic track emulates the path of a pendulum • Magnets swing next to copper coils to induce current • The testing process (Section 2.7) assesses the function of K.E.G. in the turbulent flight environment • Voltage data collected via LASCAR EL-USB-3 data logger each second

  6. Design Overview • Structure: • Foam core, hot glue, aluminum tape • LASCAR Voltage USB logger • Connected to positive and negative feeds of generator • Logs data with specified rate and start time • Data stored on the USB, retrieved through PC-USB compatible software • HOBO Data Logger • Measures internal/external temperatures, humidity • Data retrieved shall be correlated with altitude information • Activated with external switch • Image and Video • Canon A780 Camera programmed to record images and video at select time intervals

  7. Design Overview

  8. Organizational Chart J.J COREY EMILY DALTON GLENDA ADAM GABRIELLE

  9. DATESCHEDULE 9/13/2011 Team Meeting (9-9:30am) 9/14/2011 Team Meeting (5-8pm) 9/15/2011 Team Meeting (4:30-7pm) 9/16/2011 Complete and turn in Proposal 9/19/2011 Complete Conceptual Design Review (CoDR) 9/20/2011 Turn in CoDR and give presentation 9/22/2011 Team Meeting (4-6pm) 9/23/2011 Turn in order form for mechanical components 9/27/2011 Receive mechanical components 9/26-30/2011 Assemble satellite structure and generator 9/29/2011 Team Meeting (4-6pm) 10/3/2011 Complete Design Document Revisions A/B and CDR 10/4/2011 DD Revisions A/B and CDR due 7:00 am 10/3-7/2011 Structure Testing (whip, kick, and drop tests) 10/6/2011 Team Meeting (4-6pm) 10/10-14/2011 General motion tests (vibration/oscillation of generator) 10/13/2011 Team Meeting (4-6pm) 10/20/2011 Team Meeting (4-6pm) 10/24/2011 Complete testing; final satellite and generator completed 10/25/2011 Pre-launch inspection 10/27/2011 In-class mission simulation test; Team Meeting (4-6pm) 11/1/2011 Launch Readiness Review (LRR) presentation due at 7:00 am 11/1/2011 Design Document Revision C due at 7:00 am 11/3/2011 Team Meeting (4-6pm) 11/4/2011 Final Dynamo satellite weigh-in and turn-in 11/5/2011 Launch Day (4:45am-TBD) 11/5-28/2011 Data analysis and compilation 11/29/2011 Final team presentation and report 12/3/2011 Integrated Technology and Learning Laboratory (ITLL) Design Expo

  10. Budget

  11. Biggest Worries… • Generator: • Malfunctions • Lack of energy generation due to design flaws • Magnetic components interfering with electronics • Structure: • Unable to handle the rigors of flight • Staying connected to GPS unit, from which altitude data is derived • Being over budgeted weight/cost once construction begins • Malfunctions of any other electronic components, switches, wiring, solder joints, etc…