Evaluation Tools to Support ITS Planning Process FDOT Research #BD015-19

Evaluation Tools to Support ITS Planning Process FDOT Research #BD015-19. presented to Model Advancement Committee presented by Mohammed Hadi, Ph.D., PE November 24, 2008. IDAS Limitations. Evaluate a large number of ITS deployments. However:

johnrharris
Télécharger la présentation

Evaluation Tools to Support ITS Planning Process FDOT Research #BD015-19

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Evaluation Tools to Support ITS Planning Process FDOT Research #BD015-19 presented toModel Advancement Committee presented byMohammed Hadi, Ph.D., PE November 24, 2008

  2. IDAS Limitations • Evaluate a large number of ITS deployments. However: • Not consistent with the Florida calibrated models • Requires manipulation of FSUTMS output files for use as inputs to the tool • Software design and interfaces using 1990s software technologies • Methods and some parameters selected in the 1990s • Not flexible to allow evaluating new ITS elements and components, performance measures, etc.

  3. FDOT Project • Develop a tool and methods to perform ITS sketch planning evaluations as part of the FSUTMS/Cube environment • No need for file conversion • Use calibrated regional models • Flexible and extendable evaluation environment • Up to date methods and parameters • Powerful data handling and modeling capabilities. State-of-the-art user interface of Cube • The project is a joint effort of the FDOT System Planning Office and the FDOT ITS Section

  4. Evaluated ITS Deployment (1) • Ramp Metering • Incident Management Systems • Highway Advisory Radio (HAR) and Dynamic Message Signs (DMS) • Advanced Travel Information Systems • Managed Lanes • Signal Control • Transit Vehicle Signal Priority • Emergency Vehicle Signal Priority

  5. Evaluated ITS Deployment (2) • Monitoring and Management of Fixed Route Transit • Transit Information Systems • Transit Security Systems • Transit Electronic Payment Systems • Smart Work Zones • Road Weather Information Systems

  6. Evaluation Tool

  7. Assessment Elements • Performance modules (emission, fuel consumption, safety, TT) • ITS impacts • ITS costs • Dollar values of benefits

  8. Benefit Evaluation Methods • A method developed for each component • Review and assessment of methods used in evaluation tools • Review of literature • Default ITS impact parameters derived based on a review of previous evaluation studies, US DOT JPO benefit database and the values used in existing ITS sketch planning tools. • The user will be able to change the default ITS impact parameters and perform sensitivity analysis.

  9. Model Input • ITS Component

  10. Model Input for Incident Management (1) • Alternative Information • Alternative letter • Modeling year • Working directory

  11. Model Input for Incident Management (2) • Parameters from Demand Model • Auto occupancy • Percentage of truck trips in Truck_Taxi trips

  12. Model Input for Incident Management (3) • Input for ITS Applications • Analysis periods, days, and volume factor for each period • Type of incident management (Six combinations for incident management with or without DMS and HAR)

  13. Model Input for Incident Management (4) • Input for ITS Applications (Con’t) • Information type provided by DMS and HAR

  14. Model Input for Incident Management (4) • Deployment Location • Indicate the links within the coverage of incident management by adding one new attribute “IM” and assign the value of 1 to this attribute

  15. Model Input for Incident Management (5) • Analysis parameters • Incident information: frequency, duration, capacity reduction • Accident rate • Truck type and fuel consumption rate • Vehicle class percentage and emission rate for CO, HC, and NOx Notes: Default values are provided, however, user can modify it based on local conditions.

  16. Model Input • Impact factors • Diversion rate due to DMS and HAR • Fatality reduction rate and crash reduction rate

  17. Model Input • Impact factors (Con’t) • Average trip length on the mainline and on the alternative route • Percentage of diverted vehicles using freeway • Road ranger service patrol activities and costs

  18. Model Input • Dollar Value • Dollar value of time • Accident costs • Fuel costs • Emission costs

  19. Model Input • Equipment and Costs • Discount rate

  20. Model Input • Equipment and Costs (Con’t) • Equipment and unit costs for incident management, DMS, and HAR

  21. Modeling Procedure Example • Overall Structure for Incident Management • Deployment • Performance measures and benefits • Costs • Benefit/Cost ratio

  22. Modeling Procedure • Deployment • Add one new attribute to each link to indicate the type of incident management

  23. Modeling Procedure • Performance Measures and Benefits • Initialize the output files • Calculate the incident delay and time savings • Calculate reduction in accident number and costs • Calculate fuel savings

  24. Modeling Procedure • Performance Measures and Benefits (Con’t) • Calculate the emission reductions • Calculate the monetary benefits of road ranger service patrol • Output the performance and summary of benefits

  25. Performance Measures and Benefits • Initialization • Calculate the total number of study periods • Set all the initial values to be zero

  26. Performance Measures and Benefits • Travel Time • Loop over all the analysis periods • Calculate the traffic volume during the study period • Prepare the calculation of travel time on alternative route • Calculate incident delay and total time savings • Save the performance and benefits for each analysis period

  27. Performance Measures and Benefits • Safety • Loop over all the analysis periods • Calculate number of fatalities, injuries, PDO • Calculate accident costs • Save the performance and benefits for each analysis period

  28. Performance Measures and Benefits • Fuel Consumption • Loop over all the analysis periods • Calculate vehicle miles in queue and fuel consumption in queue • Calculate fuel savings • Save the performance and benefits for each analysis period

  29. Performance Measures and Benefits • Emissions • Loop over all the analysis periods • Calculate emissions of CO, HC, NOx due to the queues • Calculate emission reductions • Save the performance and benefits for each analysis period