1 / 20

2023 COLOMBIAN POWER SYSTEM EXPANSION PLAN

2023 COLOMBIAN POWER SYSTEM EXPANSION PLAN

jozzer
Télécharger la présentation

2023 COLOMBIAN POWER SYSTEM EXPANSION PLAN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2023 COLOMBIAN POWER SYSTEM EXPANSION PLAN WistonAndresÑustes Cuellar

  2. Agenda • Powerdemand in Colombia • Generationprojection in Colombia • Transmissionprojection • Powersystemone-line diagramsfor 2023 • Conclusions • References

  3. Powerdemand in Colombia • Maximumpower in 2007 (December): 9,079 MW • Maximumpowerin 2008 (December): 9,093 MW

  4. Powerdemand in Colombia Currentaveragepower: 10MW Averagepowerfor2023: 15MW

  5. Generationprojection in Colombia

  6. Generationprojection in Colombia • ProjectedCapacity: 13545,8 MW • HidraulicProjects: 7685.5 MW • Coal projects: 2520.5 MW • Natural gas projects: 305 MW • Projects of fuel oil: 70.4 MW • Cogeneration projects: 44.9 MW • Wind projects: 20 MW

  7. Generationprojection in Colombia Hidroelectric: Coal:

  8. Generationprojection in Colombia Developingprojects:

  9. Colombianmedium and long term projection generation

  10. Transmissionprojection

  11. Actual TransmissionSystem

  12. DefinedExpansion

  13. Long termTramissionSystem

  14. Short CircuitCapacity500 kVSubstations

  15. Short CircuitCapacity230 kVSubstations

  16. Actual power system one-line diagram

  17. 2023 powersystemone-line diagram

  18. Conclusions • The low demand scenario implies an additional required capacity after 2020. • 230 kV substation short circuit capacity is higher than 500 kV substations. • The Colombian power system will have large hydroelectric generation plants as Ituango, Quimbo, Sogamoso, and substations like Bosque, Porce III, Nueva Esperanza • Into the generations projects that we saw, Ituango will have the biggest generation with a capacity of 1,2 GW.

  19. References [1] Upme, Plan de expansión de referencia Generación-Transmisión, 2009. [2] http://www1.upme.gov.co/ [3] http://www.creg.gov.co/html/i_portals/index.php [4] http://www.portafolio.co/economia/

More Related