1 / 9

Arizona Canal Multiuse Path Improvements Chaparral Road to Indian Bend Wash

December 6, 2012 Public Meeting. Arizona Canal Multiuse Path Improvements Chaparral Road to Indian Bend Wash . AZ Canal Multiuse Path. Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to the Indian Bend Wash Project also includes: Pedestrian Bridges

judah
Télécharger la présentation

Arizona Canal Multiuse Path Improvements Chaparral Road to Indian Bend Wash

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. December 6, 2012 Public Meeting Arizona Canal Multiuse Path Improvements Chaparral Road to Indian Bend Wash

  2. AZ Canal Multiuse Path • Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to the Indian Bend Wash • Project also includes: • Pedestrian Bridges • Neighborhood Connections • Landscaping • Lighting • Public Art

  3. AZ Canal Multiuse Path • Enhance mobility for bicyclists and pedestrians throughout the region • Provide connectivity to Papago Park, the Phoenix Zoo, the Desert Botanical Gardens, Tempe Town Lake and the Indian Bend Wash path system • The cities of Tempe, Phoenix and Scottsdale have been working to complete a 17-mile regional pathway system • Once constructed, this project will complete Scottsdale’s portion of the 17-mile loop • Total Project Budget of approximately $4M

  4. AZ Canal Multiuse Path • Project Team • Olsson Associates and Jody Pinto • Partnership between the City of Scottsdale, Salt River Project and Scottsdale Public Art • Includes Federally Funding • Congestion Mitigation and Air Quality Funds • Follow the Federal Process • Required Clearances • Min. 2 year Design Process

  5. AZ Canal Multiuse Path

  6. AZ Canal Multiuse Path

  7. AZ Canal Multiuse Path

  8. AZ Canal Multiuse Path

  9. AZ Canal Multiuse Path • Next Steps • Develop Master Plan and Artist concepts • Second Public Meeting – Winter 2013 • Design Review Board – Winter/Spring 2013 • Project Schedule • Complete design – Summer 2014 • Start construction – Fall 2014