1 / 5

Re-commissioning campaign

Re-commissioning campaign. P8 Warm Magnets re-commissioning and SCT Marco Zanetti. P8 Warm Magnets and Circuits. LHC magnets. Injectors magnets in UJ88 UJ87 and RH87. Injectors magnets in RA87. P8 WM Tests. Tests performed on week 16 WIC-Magnets, WIC-PC (Pierre D.)

jui
Télécharger la présentation

Re-commissioning campaign

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Re-commissioning campaign P8 Warm Magnets re-commissioning and SCT Marco Zanetti

  2. P8 Warm Magnets and Circuits LHC magnets Injectors magnets in UJ88 UJ87 and RH87 Injectors magnets in RA87

  3. P8 WM Tests • Tests performed on week 16 • WIC-Magnets, WIC-PC (Pierre D.) • Done successfully for all magnets/circuits • PC tests (Hugues) • Powering sequence run for all magnets individually • Interference between LHC compensator (SVC) and TI8 PCs to be verified • Heat run (Pierre T.): • 24 h run for LHC magnets and septa. Result OK (T<50 C) • Current versus OK • Magnet polarity OK

  4. Schedule

  5. P6 Short Circuit Tests • RQ4.L6 and RQ4.R6 (UA63 and UA67) • Preparation work ongoing (EL and CV), to be ready for Tuesday morning (one day delay due to missing loctite on rotative joint on WCC) • Deconsignation and balisage by Gerard • PC preliminary tests at 12.00 on Tuesday • Heat run 14.00-22.00

More Related