An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Maintenance Cost

  2. Maintenance Cost Total Cost Breakdown maintenance cost Preventive maintenance cost Maintenance cost (RM) Optimum

  3. Cost of Maintenance • Spare parts • Labor • Down time (production loss) • Overhead • Consumables • Hand tools, power tools and equipment

  4. Who will do maintenance? • In-house • Out-source

  5. Decision to out-source • Lack of expertise • Too hazardous • No experience • Bound by contract • Top management policy

  6. Example The record of computer breakdown for Company PCK for the past 20 months is shown below.

  7. Each time computer breakdown – estimated loss is RM300 • Contract preventive maintenance by company DK – RM200 per month • Should PCK contract out preventive maintenance to DK?

  8. Solution Step 1 • Calculate expected number of breakdown (based on past records) if the company continue without service contract. Step 2 • Compute expected breakdown cost per month with no preventive maintenance contract Step 3 • Compute the cost of preventive maintenance

  9. Solution Step 4 • Compare the two options and select the one which cost less

  10. Solution Step 1 Expected # of breakdowns = (# of breakdown) x (frequency) = (0)(0.2)+(1)(0.4)+(2)(0.3)+(3)(0.1) = 1.3 breakdown per month

  11. Solution Step 2 Expected breakdown cost = (expected # of breakdown) x (cost per breakdown) = (1.3) x (300) = RM390 per month

  12. Solution Step 3 Calculate Preventive Maintenance Cost = cost of expected breakdown + cost of service contract = (1 breakdown per month x 300) + RM220 per month = RM520 per month Step 4 Compare Less expensive to suffer breakdown without service contract. Breakdown = RM390 Service contract = RM520 Therefore, continue present policy.

  13. Need to consider • Customer service • Loss of production • Loss of customer goodwill, reputation • Machine life • Availability of spare parts and expertise • Safety to the user / customer • Environmental problem (pollutant discharge etc.)