60 likes | 169 Vues
This report details ongoing work in the PP0 area, focusing on the mechanical connections between Type 1 services and Flex connectors on discontinuous boards. It highlights the implementation of Type 1 connectors on a single board, alongside specifications for beam pipe geometry. The document outlines construction milestones for Week #15 through Week #17, including the completion of a scale one mock-up, installation of a central concrete tower, and associated components like mini vans, access stairs, and handrails. The report also discusses the survey and adjustment processes critical to project progress.
E N D
WG3 – General information on work progress R. Vuillermet
PP0 area connection Common reference and mechanical connection between type 1 services and flex Flex connectors on discontinuous boards Type 1 connectors on a single board
VI Beam Pipe Geometry Mark Gallilee Use to be 3 mm in the TDR !
Construction of the scale one mock-up in building 180 Week #15 – Survey of the rail system – installation of the central tower of concrete block Week#16 – Installation of the minivans – installation of access stairs – installation of hand rails – Installation of central plate on the tower Week#17 – Installation of Bridge and scaffolding – installation of ITF – Survey and adjustment