Ellucian Portal: NYCDA’s journey to and use of portal 4.1

Ellucian Portal: NYCDA’s journey to and use of portal 4.1. Presented by: David Palmer , CEO The New York Conservatory for dramatic arts 6/18/2015. Goals. Single place to access all resources SSO Ease of use for students, staff and faculty Ease of management. Where we came from.

juliette
Télécharger la présentation

Ellucian Portal: NYCDA’s journey to and use of portal 4.1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EllucianPortal: NYCDA’s journey to and use of portal 4.1 Presented by: David Palmer, CEO The New York Conservatory for dramatic arts 6/18/2015 PCNEAT 2015: It’s New York Sweet

  2. Goals • Single place to access all resources • SSO • Ease of use for students, staff and faculty • Ease of management PCNEAT 2015: It’s New York Sweet

  3. Where we came from • Deployed PowerCampus Portal in September 2007 • Extensive GUI modification • SharePoint 2007 and 2010 had limitations PCNEAT 2015: It’s New York Sweet

  4. Our “upgrade” process • Spent significant time on preparing SharePoint environment • Did not migrate content • Manually moved content • Difficult mostly for rights and access issues otherwise not too tough • Comparative ease of configuration (no web application management tool or manual editing of config files • Now upgrades are a breeze – we did 4.0 to 4.1 in 30 min or less PCNEAT 2015: It’s New York Sweet

  5. Environment • ISCSI SAN • For our size, a two-server topology was sufficient for all SharePoint services deployed • WFE Server – VMware, Windows 2012 R2 Datacenter x64, 32 GB memory • Database Server – VMware, Windows 2008 R2 Enterprise x64, SQL 2012, 64 GB memory, hosts other apps including PowerCampus, PowerFaids, SelfService • Larger usage case may require more resources • Use EllucianADWatcherand Profile Updater PCNEAT 2015: It’s New York Sweet

  6. Demonstration PCNEAT 2015: It’s New York Sweet

  7. Q&A PCNEAT 2015: It’s New York Sweet

  8. Thank You! • Contact Information: • dpalmer@sft.edu • W (212) 812-4040M (917) 767-7225 PCNEAT 2015: It’s New York Sweet

More Related