An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APEX “end game” Fulvia Pilat Machine-Experiments Meeting May 29, 2007

  2. APEX Run-7 • Regularly scheduled • Uptime ~60-70 % • Review activity  AEAC spreadsheet • Last 3 sessions: request vs. available time • Another AEAC meeting suggested

  3. Tomorrow APEX • BBA – 2h to wrap up – injection • Chrom feedback – take data – injection – 1h - both • Reproducibility 1h injection+ramp+store • Tune, orbit, chrom drifts – injection + ramp – 1h • IBS lattice – ramps+store (leads) – 3h • AC dipole – injections – gradient – 1h • Near integer WP – 2h at injection

  4. End of the run • IBS lattice development 12 h • Stochastic cooling 2h • Tune, orbit, chromaticity drift 2h • Main PS –common noise feedback 1h • IBS measurements 2 h • Beta* squeeze 4h • Chromaticity feedback 6h • BBLR 3h • Nonlinear chromaticity 2h • Transition instability 2h • Skew chromaticity 3h • Tune modulation LF Schottky 2h • Repeatability 3h • Energy loss 70 GeV 4h • Au 77 2h • TOTAL REQUESTS 50h • MAX AVAILABLE 35h

  5. June 6(low energy run or maintenance) • Chrom feedback - test ramps – 2h • Stochastic cooling – store – 6 bunches – 2h • Beta* squeeze – 4h • Transition instability - ramps – 2h • Skew chromaticity – store – 3h • Tune modulation LF Schottky – store – 2h • Repeatability injection+ramp+store 1h June 13(low energy run or maintenance) • IBS lattice – 4h • Chrom feedback (test of feedback) • Main PS –common noise feedback 1h – blue • Au 77 - measure emittance with gas-jet – 1h • Nonlinear chromaticity – 2h • Energy loss 70 GeV - 3h – ramp development (possibly more) • Repeatability 1h injection+ramp+store June 20 • Repeat 1h injection+ramp+store • BBLR – 3 h store