API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management

API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management. Don Wells Hess Corporation. History / Status. Document released in 2009 Specificatio n contains: Life Cycle Process ( LCP ) Define, Plan, Implement, Feedback ( DPIF ) Loop 12 Key Practices ( KP )

julio
Télécharger la présentation

API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. API 17NSubsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation

  2. History / Status • Document released in 2009 • Specification contains: • Life Cycle Process (LCP) • Define, Plan, Implement, Feedback (DPIF) Loop • 12 Key Practices (KP) • Technology Qualification Process • Technology Readiness Level

  3. Initial Plan / Path Forward • Process • Split into 5 subgroups (now 6) • Industry Leaders • Common Template • Introduce IM into the scope of 17N: • Define IM • Expand the Life Cycle Processes • Reassessment through remediation • Define TRL progression

  4. Detail • Expand the Life Cycle Process • Provides balance and depth to the document • Communication of goals & requirements

  5. Detail • Change to a Dual-DPIF loop • Add Remediation cycle • Facilitates Integrity Management

  6. Specification Development(Greenfield Projects)

  7. Specification Development(Brownfield Projects) ..and acceptance criterion

  8. Current Progress • Progressed Plan as Presented in Previous Meetings API RP 17N Meetings Key dates December 10th January 31st November 1st August 21st October 14th October 28th January 13th October 15th Issue of document (Main section and Annexes A & C) Deadline for comments on ‘August 21st issue’ Issue of complete document (Main section and ALL Annexes) Deadline for comments on ‘November 1st issue’ Final API RP 17N Issue API RP 17N Meeting to discuss high level comments and comments from decomworld conference API RP 17N Meeting November 1st to introduce comments spread sheet and close out outstanding comments. Meeting to close out outstanding comments.

  9. Progress • Workshop held in Washington • Solicited Input from outside of 17N • Minutes and Summary Document distributed to all participants • Feedback incorporated into 17N

  10. Progress • Workgroups Submitted Input • Using Common Template • Edited into a Single Document • Astrimar • Circulated for Comment within 17N Committee • 3 rounds, 1,000+ • Last Comments Due Dec 10th • Clarification Discussions at Jan 13th meeting

  11. Progress • Comments have been Prioritized • Are currently being included • Not full Fidelity for all comments / subjects • Decommissioning • Obsolescence • Field Life Extension • Human Factors • Configuration Management / MOC • Final Document Due January 31+

  12. 17Q History • Plans for API 17Q • Last meeting, we were asked to blend 17Q into 17N • Work indicated that this was not best approach • Rationale • Different Subjects • Qualification Not Unique to 17N • Expect Revision at a Different Rate • Qualification /Verification details from 17N will be Incorporated into 17Q

  13. 17Q Plans • Path Forward • 17Q Committee to establish current Status • January 30th • Define an “Ideal” version • Define a “Minimum” version • Make decision on Path Forward • Minimum Version of Document • with planned future revision • Ideal Version plus Technical Report & Work Plan • Organizational Needs • Funding Needs • Schedule

  14. Plans • Original Plans included a “Pre-Ballot” Workshop • Change of Plans • Not a New Document • Large Active Committee • Potential to Circulate to Washington Workshop attendees • OK? • OTC Paper submitted • Presentation as part of API 17 Session

  15. Next • Complete Planned Activities • Deliver Summary Report on Completion • Recommended Next Steps • Issue Document to API • Format, Ballot, etc. Question • How do we “Deliver” to Industry • API University • Industry Training

  16. Thanks You’s • To Everyone Involved • Workgroup Leaders • Participants • Workshop Attendees • Astrimar • BSEE • Large Amount of Effort by everyone • Large amount of detail developed, considered and Worked • Even with the Growth in Scope, effort continued and quality maintained • A great deal of quality work was completed!