Prefab System. Prefab System. Reducing 50% of mistakes by installation Energy saving Reduction of CO2 emission Garanty. Prefab System. Reduction of Application failures with 50%.
E N D
Prefab System • Reducing 50% of mistakes by installation • Energy saving • Reduction of CO2 emission • Garanty
Reduction of Application failures with 50% Snap the foil faced section over the pipe and close the joint by pressing the half sections firmly together. PRE FAB SYSTEM
Reduction of Application failures with 50% After pressing the half sections together, remove the protective strip and push the tape over the longitudinal seam to close the vapour barrier foil facing. PRE FAB SYSTEM
Reduction of Application failures with 50% Remove the protective strip and push the tape over the circumferential seam to close the vapour barrier foil facing. PRE FAB SYSTEM
Reduction of Application failures with 50% PRE FAB SYSTEM
Reduction of Application failures with 50% PRE FAB SYSTEM
Reduction of Application failures with 50% PRE FAB SYSTEM
Reduction of Application failures with 50% PRE FAB SYSTEM
Reduction of Application failures with 50% PRE FAB SYSTEM
Reduction of Application failures with 50% PRE FAB SYSTEM
Reduction of Application failures with 50% PRE FAB SYSTEM