1 / 4

Octopus

Octopus. Standards and Norms. OPM. F3. MM. F8. FM. F2. F6. F11. F-MAN. F1. F10. Wagons owner. OM. F7. F4. F12. F9. F5. Environment. Wagons. Contractual data. Functions Description (1). F1: To provide the OM request of empty wagons to the FM.

kacia
Télécharger la présentation

Octopus

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Octopus Standards and Norms OPM F3 MM F8 FM F2 F6 F11 F-MAN F1 F10 Wagons owner OM F7 F4 F12 F9 F5 Environment Wagons Contractual data

  2. Functions Description (1) • F1: To provide the OM request of empty wagons to the FM. • F2: To provide to the FM the wagons location, which satisfies the OM request considering information provided by the OPM and by the OBT. • F3: To provide to the FM the OPM validation of transport feasibility of the empty wagons. • F4: To transmit to the OM the FM confirmation concerning the request feasibility.

  3. Functions Description (2) • F5:To permit the FM to establish a hierarchy among empty wagons orders considering contractual data for a best treatment. • F6: To transmit an order for sending of empty wagons from the FM toward the OPM. • F7: To provide request modifications by the OM to the FM. • F8: To take into account and inform the FM about event messages on rerouting data provided by the OPM and by the OBT.

  4. Functions Description (3) • F9: To transmit to the FM the consequences of the mismatch between the first request and the OM modifications. • F10: To provide to the wagons owner and the MM with hints for preventive maintenance actions. • F11: To allow the FM and the MM to agree on wagon preventive maintenance planning. • F12: To inform the FM, the OM, the wagons owner, the MM of the damage on wagons.

More Related