1 / 1

Water Level (cm)

Water Levels in the Reservoir During Filling and Draining. 25. 20. Draining after 30 minutes. Draining after 1 hour. Draining after 5 minutes. Draining after 2 hours. Draining after 3.5 hours. 15. Water Level (cm). 10. 5. 0. Fill Point.

kaiyo
Télécharger la présentation

Water Level (cm)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water Levels in the Reservoir During Filling and Draining 25 20 Draining after 30 minutes Draining after 1 hour Draining after 5 minutes Draining after 2 hours Draining after 3.5 hours 15 Water Level (cm) 10 5 0 Fill Point This graph is based on data taken during a fill-drain test of the UHC Mini Parking Lot in Blacksburg, VA during the summer of 2006. Data collected by Mona Dollins Animation by Sarah Dickinson

More Related