410 likes | 796 Vues
ALCOA: . EAST HALLS RENOVATION. EDSGN 100 Section 008 12/9/13 . Eddie Taddei Daniel Guarracino Richard Hayward Nicholas Kappeler Brianna Haglan. Table of Contents. The Opportunity Background Information Conditions & Objectives Collective Creative Ideas Evaluation Analysis
E N D
ALCOA: EAST HALLS RENOVATION EDSGN 100 Section 008 12/9/13 Eddie Taddei Daniel Guarracino Richard Hayward Nicholas Kappeler Brianna Haglan
Table of Contents • The Opportunity • Background Information • Conditions & Objectives • Collective Creative Ideas • Evaluation • Analysis • Prototype • Conclusion
ALCOA The company… The product… Infinitely recyclable Hall-Heroult Process • Leading producer of aluminum • Largest miner of bauxite • Largest refiner of alumina • Involved in multiple markets • *Properties of Aluminum • Light weight • Corrosion resistance • Conductivity • Reflectivity • Recyclability
Why are we here today? • Penn State & Sustainability • Identify campus opportunities • Examine inputs & outputs • Take advantage of aluminum’s intrinsic properties • Increase efficiency or sustainability • Opportunity: to increase sustainability by using aluminum and taking advantage of the upcoming east halls renovation
East Halls • Built over 60 years ago in the 1950s • Comprised of 15 buildings, ranging in size,layout, and energy usage • Last year’s East Halls energy usage data shows that all fifteen halls used a total of 5.1 million kWh of energy, with an average energy per building of 339,836 kWh • Hastings Hall (average building assumption) • A look at a recent energy consumption will give us an estimation as to how much energy our solution will need to save over the course of its lifetime
The opportunity at hand… • Customer Needs • Students • Not enough natural lighting in dorms • North and south facing • OPP • Increase sustainability • Increase attractiveness of living area • Decrease energy consumption • Implement student ideas • Alcoa • Expand market and advertise products • “Mine” ideas
Who does this project affect? • Stakeholders • Alcoa • Penn State OPP • Students/RAs • Construction contractors • Legal Departments • Researchers • Environmental groups • Waste Management • Local Centre County residents • Local businesses
Project Guidelines • Efficiency/ Sustainability • Must use less energy than previous solutions • >60.8 kilowatt-hours • Marketability • Feasible implementation within 5 years • Cost-Effective • Cost of design < cost of electricity saved from design • Safety • Must meet OPP safety codes
Calculating Weight using AHP Table 1. Weight Matrix
Brainstorm Ideas Option 1 Option 2 Option 3
Brainstorm Ideas Option 4 Option 5 Option 6 Imagine...aluminum
Brainstorm Ideas Option 7 Option 8 Similar to option 6 with filtration system
Evaluate Ideas Table 2. Concept Screening
Evaluate Ideas Table 3. Concept Scoring
Analysis • The light reflectors were chosen due to their feasible implementation. • Their simplistic design makes them durable and sustainable • They had the highest rate of return on the investment • Light reflector maintenance is easy to learn • Design can be retrofitted to fit different sized areas • Available in depths up to a maximum projection of 30 inches (762mm) and a maximum span of 72 inches (1828mm) • LEEDs certified in three categories • Materials & Resources-Recycled Content • Energy & Atmosphere – Optimize Energy • Performance and Indoor Environmental Quality – Daylight and Views
Prototype Construction Fig. 1 Without Shelves
Prototype Construction Fig. 2 With Shelves
Prototype Construction Fig. 3 Individual Light Shelf
Prototype Construction Fig. 4 Future of East
Prototype Construction Fig. 5 InLighten Light Shelves
Prototype Construction Fig. 6 InLighten Light Shelves
Design Solution • Energy efficient design • Implementation meets OPP deadlines for East Halls Renovations • Meets OPP safety Codes • LEEDs certification accredits sustainability of product • $14,000 to retrofit 1 building (140 rooms at $100 each) • Over 50 years: • $1.5 million spent at 9 cents kw-h (1 building average) • 6.1 ft width for avg. window (saves $10 per foot) • $427k saved over 50 years • Break-even point after 5 years
References Photo Credits • http://c2ccertified.org/images/product_images/Alcoa.jpg • http://www.scielo.br/img/fbpe/jbchs/v11n3/n3a7f1.gif • http://onwardstate.com/wp-content/uploads/2013/02/east-halls.jpg • http://www.psu.edu/sites/default/files/styles/landing_page_focus_245_170/public/AC_colleges.jpg • http://www.santorobuilding.com/santoro-images/construction/construction-management-2.jpg • http://www.yorkproperty.com/images/C21.jpg • http://66.147.244.229/~colonic4/blog/wp-content/uploads/2011/08/metal-roofing1.jpg • http://www.lift-report.com/Bilder/LR_5_04_22e//Bild1.jpg • http://www.reddteam.com/wp-content/themes/redd/category_images/universal-wheelchair-ramp-system.jpg • http://thecompactorguy.com/images/article_photos/53.jpg • http://www.kawneer.com/kawneer/green/en/images/img-inlighten-info3-main.jpg • http://www.opp.psu.edu/services/energy/energy-usage • http://www.alcoa.com/global/en/products/product.asp?prod_id=1852&Product=&Category=&Query=inLighten&page=0 • http://www.kawneer.com/kawneer/north_america/en/product.asp?cat_id=1344&prod_id=1852 • http://www.alcoa.com/aap/north_america/catalog/pdf/specifications/ReynobondEngProperties.pdf • http://www.hfs.psu.edu/housing/housing/residence-areas/bigler-curtin-geary-packer.cfm