Eu - Dap 2 : Implementation of Eu-Dap project at a population level

Eu - Dap 2 : Implementation of Eu-Dap project at a population level. 1° Transnational Meeting of WP6 &WP7 Thessaloniki, 03-04 December 2006. 10 PARTNERS. Leader: Osservatorio Epidemiologico delle Dipendenze, Italy Universita degli studi Dell’ Aquila, Italy

kamea
Télécharger la présentation

Eu - Dap 2 : Implementation of Eu-Dap project at a population level

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Eu-Dap 2: Implementation of Eu-Dap project at a population level 1° Transnational Meeting of WP6 &WP7 Thessaloniki, 03-04 December 2006

  2. 10 PARTNERS Leader: Osservatorio Epidemiologico delle Dipendenze, Italy • Universita degli studi Dell’ Aquila, Italy • Universita degli studi del Piemonte Orientale, Dipartimento die Science Mediche, Italy • Institut für Sozial- und Gesundheitspsychologie, Austria • Stockholms Läns Landstig, Centrum för Folkshälsa, Sweden • Edex, Spain • Provincialaat der Broeders van Liefde, De Sleutel, Belgium • PYXIDA, Drug abuse prevention and health promotion center • Poznan University of medical sciences, Poland • Centre for Addictology, Psychiatric Clinic, Czech Republic

  3. Implementation of EUDAP Project Objective one • Long term follow up of the EUDAP cohort Objective two • The improvement of the ‘Unplugged’ package and the preparation of a more detailed ‘hand book’ for teacher to allow schools to implement the programme also with a reduced training. Objective three • To develop an ‘dissemination manual' useful to find ways to spread programs at a population level. Objective four • To assess the “dissemination manual” and to esteem the real effectiveness of the programme outside an experimental setting.

  4. Structure of the project

  5. WP 4 - Long term follow-up Criteria to decide to carry out the 3° FU: • Definite rate of matched questionnaires • Residual results on program effectiveness from the 2° Follow up • Prognoses of centres about the success of the 3° Follow up

  6. WP 5 - Review of the intervention manual • In revising manual the group should be aware on the risk of generate a different program that need to be re-evaluated • The monitoring the process data have to be published in a report together with the presentation of the program (before or after the publication of a corresponding scientific paper) • The parent arm can be kept in the manual as an option of the program but the peer arm is cancelled • Local groups should exploit the data on monitoring the process together with teacher comments • The group (Peer - the leader - Maria, Sarah, Maro, Serena or Roberta)

  7. WP 6 - Dissemination manual • The WP6 deals with the field of “how to translate evidence into practise” and “how to design the implementation” • The working group have to be aware that schools and teachers level could overlap the intervention manual • The Manual should be general, not specific for the dissemination of Unplugged • Given the strong relationship with WP 7, it was decided to build a unique group

  8. Preliminary meeting in Turin Decisions to be taken: • Criteria (e.g. which level, which base of evidence?) • Table of contents • Who writes what? Outline of Wp6 & Wp7 – Draft for discussion from Rosaria

  9. WP 7 - Dissemination and Field Evaluation • The WP should describe and evaluate the actions of dissemination of Un-plugged by means of the Guidance (produced within the WP 6) • Object-aims • How (study design) • Where (population/centers) • Indicators (what do we want to find out) • The WP 6& 7 group will meet 3- 4 December 2006 in Thessaloniki • The group is composed by Rosaria (leading the WP 6) Maro (leading the WP 7), Sarah, Ewa, Karl, Serena, Federica, Leila, Roman

  10. Timeline • Weeks 3: send to Torino the details of the activities of the WP • Month: 1-2 redefinition of budget • Month: 3-4: decision on 3° FU • Month 1-11: review and translate and print Intervention Manual • Month 1-12: Guidelines translated and printed • Month 1-12: design of the evaluation