1 / 19

FEMA-1505-DR San Simeon Earthquake

FEMA-1505-DR San Simeon Earthquake. Santa Barbara County Dave Rickard . Inspection Team . Building “C” Superior Court . Building “C” Superior Court. Typical Concrete Sidewalk Damage. Building “B” Example. Cracking. Cracking. Cracking. Building “G” Main Courthouse. Cracking. Cracking .

kamuzu
Télécharger la présentation

FEMA-1505-DR San Simeon Earthquake

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FEMA-1505-DRSan Simeon Earthquake Santa Barbara County Dave Rickard

  2. Inspection Team

  3. Building “C” Superior Court

  4. Building “C” Superior Court

  5. Typical Concrete Sidewalk Damage

  6. Building “B” Example Cracking Cracking Cracking

  7. Building “G” Main Courthouse Cracking Cracking Cracking

  8. Building “G” South Wall Cracking Concrete Damage

  9. Building “G” Basement Floor Crack 1/8” Crack Crack

  10. Building “G” Basement Floor Cracking Example 1/8” open cracking 15 LF in File Room

  11. Building “G” Jail Holding Spot Sceam Cracking

  12. Building “G” Basement Cont’ Example Wall Cracking Entire Length of Wall

  13. Building “G” Jail Area Typical Cracking – Patch and Paint Crack

  14. Planter in front of Courthouse Quake punched out concrete and broke paint

  15. Laguna Sanitation Wastewater Treatment Plant Repairs to fiberglass baffles

  16. Repairs to primary digester and feed piping

  17. County Insurance – Self Insured • The County's deductible for Earthquake [EQ] coverage is 5% of the total values per "Unit" per occurrence subject to a $500,000 minimum.  A "Unit" is defined as a separate building, contents within a separate building, property in the open (yard), or time element coverage at a separate building.

  18. List of Projects & Dollar Amount • Laguna Sanitation Wastewater Treatment Plant $50,000 • Public Defender Build. Interior Bathrooms and Exterior Cracking $30,000 • Court House “Facility G” Exterior and Interior $125,000 • Building “B” 312 Cook St Exterior Cracking = $5,000 • Sidewalks and Planter repairs – $5,000 • Juvenile Hall (SB) = $20,000 • HMGP Grant Request = Retrofit All Courthouses to Required Codes and Standards = $4,000,000 • Total Requested – Public Assistance = $235,000 • Hazard Mitigation Proposal = $4,000,000

  19. Any Questions “Here’s Your $4 Million” Santa Barbara “Burp”

More Related