Comparing Efficiency

Comparing Efficiency. Comparing Sem II and the Library Building energy consumption By Brennon Murphy Derik Archibald. If TESC were to use Seminar II building to its full capacity for classroom use, instead of the Library would TESC save energy and money. Hypothesis:

Télécharger la présentation

Comparing Efficiency

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Comparing Efficiency Comparing Sem II and the Library Building energy consumption By Brennon Murphy Derik Archibald

  2. If TESC were to use Seminar II building to its full capacity for classroom use, instead of the Library would TESC save energy and money Hypothesis: • Yes, if TESC were to transfer classroom use from the Library to the modern Sem II building it will save a substantial amount of energy and money. • No, if classrooms were to transfer from the Library to the Sem II building barriers created by the features of Sem II may prevent full use of the building and may actually make it less efficient than the Library. Thus Sem II may become overloaded making it very inefficient. • Null Hypothesis, it is impossible to compute classroom usage only in both Sem II and Library because the barriers with the energy use breakdown.

  3. Accepted Hypothesis • Null Hypothesis • No meters for Sem II • Rough Analysis • TESC Total energy before and after Sem II • Total Energy after – Total energy before= rough estimate of Sem II energy use.

  4. Promote Energy Efficiency • Promote energy efficiency to its full capacity • Energy Efficiency at TESC • Learn to measure and compare energy usage • Provide an understanding inefficiency and solutions • Provide TESC with knowledge of energy usage and ways of conserving energy and money.

  5. LEED • U.S. Green Building Council (USGBC) and Leadership in energy and Environmental Design • Consensus-based national standards for sustainable buildings, adaptable to new processes and technology. • Site Sustainability, water and energy efficiency, materials and resources, indoor environmental quality, innovative technology

  6. Seminar II • 160,000 square feet • Five cluster building • Finished spring 2004 • $44 million dollar project http://www.evergreen.edu/facilities/buildings/018_SEMINARII/projects/01_03/01001.htm

  7. Seminar II Efficiency • Maximum sunlight and easy ventilation • Minimum volatile compound • Recycled hardwood, cork floors, natural ventilation, radiating heat, indirect and natural lighting. • Green Roofs, natural reservoir. • Concrete floor • 21st century wiring

  8. Library Renovation • Renovation of B and C wings • $21.5 million budget • To be completed in two phases • Begin construction March 1, 2005 • End construction June 15, 2006 http://www.evergreen.edu/facilities/buildings/001_LIBRARY%20BUILDING_%5BDANIEL%20J.%20EVANS)/projects/04_05/Libraryreno.htm

  9. Library Description • Named Daniel J. Evans Library • Constructed in 1971 • 346,969 square feet • Multipurpose building

  10. Renovation Time Line • March 1, 2005: Construction begins on Phase 1-C Wing • October 21, 2005: Construction begins on Phase II • June 15, 2006: Construction complete • Phase I & Phase II Tasks

  11. Student population increase Temperature variation Buildings always being heated or cooled Library computer lab and size TESC entire energy consumption data (every building) Construction of Sem II Modular housing, dorms Swimming pool Factors of Inaccuracy

  12. Electricity Use of TESC

  13. Library & Seminar II • Library computer labs • Library larger • Theoretical comparison • Library uses more electricity than Sem II

  14. Gas Consumption vs. Temperature

  15. Energy Costs

  16. Student Population

  17. Conclusion • Sem II is more efficient than the library • Natural Gas consumption hardly effected • Sem II uses less electricity than the Library • Sem II = 2.1 kwh/square foot • Library = 10.8 kwh/square foot

  18. Resources and Credit • Nancy Johns assistant project manager • Richard Davis campus engineer • Patty Vandewalker building services • Rob Knapp faculty • Lara Boyd student • Professor E.J. Zita • Josh Skov from Good Company • www.evergreen.edu • www.wunderground.com • www.usgbc.org/