html5-img
1 / 9

Operation Plan and Current Status of CINDY2011

Operation Plan and Current Status of CINDY2011. CINDY2011 : C ooperative Ind ian Ocean experiment on isv in the Y ear 2011. Kunio Yoneyama and Masaki Katsumata (JAMSTEC). Basic Idea Observation Network Current Status. Purpose :

kapono
Télécharger la présentation

Operation Plan and Current Status of CINDY2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operation Plan and Current Status of CINDY2011 CINDY2011 : Cooperative Indian Ocean experiment on isv in the Year 2011 Kunio Yoneyama and Masaki Katsumata (JAMSTEC) • Basic Idea • Observation Network • Current Status Purpose : Study on Intraseasonal Variability in the Indian Ocean with focus on the initiation of convection in Madden-Julian Oscillation. DYNAMO Planning Workshop at NOAA/ESRL Boulder, CO, April 13-14, 2009

  2. Proposed Network for CINDY2011 Ship (Japan, India, USA, Australia, etc.) RAMA Surface mooring (existing/planned as of Dec. 2008) Land-based sounding site (routine/possibleenhanced sites) HARIMAU Seychelles

  3. Participation from India and Australia India * R/V Sagar Kanya (India) - Committed - 1) led by S. P. Kumar (NIO) Biogeochemical cruise (CTD at fixed site) 30 days in IO They will look for the possibility of Radiosonde observation. 2) led by VSN Murty (NIO) RAMA cruise (~30 days) Australia * R/V Southern Surveyor (Australia) - Will be Proposed - led by E. Schulz, M. Wheeler, H. Hendon (CAWCR) From Colombo, Sri Lanka to Christmas Island max 25 days on station Air-sea flux + Radiosonde sounding

  4. HARIMAU(Hydrometeorological ARray for ISV-Monsoon Automonitoring) http://www.jamstec.go.jp/iorgc/harimau/ Doppler radar + Auto Weather Station Wind Profiler + Auto Weather Station Wind Profiler Doppler radar

  5. Radiosonde Observation at Seychelles Seychelles National Weather Services will conduct radiosonde sounding twice daily during the campaign (4 months) with intensive 6-hourly launch for designated 1 month (i.e., late October - early December).

  6. AMIE: Observations of the Madden-Julian Oscillation for Cloud Modeling Studies

  7. AMIE Science Steering Committee AMIE Co-Experimenters (ACEs): Tony DelGenio, Bill Gustafson, Bob Houze, Christian Jacob, Mike Jensen, Steve Klein, Ruby Leung, Xaihong Liu, Ed Luke, Peter May, Sally McFarlane, Pat Minnis, Courtney Schumacher, Andy Vogelmann, Yi Wang, Xiaoqing Wu, Shaohong Xie Chuck Long AMIE Principle Experimenter (APE)

  8. ARM TWP Sites

  9. AMIE and CINDY Sites CINDY2011/DYNAMO AMIE

More Related