1 / 6

MMF Layout, Workflow Robert Ruland

MMF Layout, Workflow Robert Ruland. Magnetic Measurements Facility Layout Workflow Summary. Layout. Floor plan divided into three functional areas Magnetic Measurements (± 0.1º C) Fiducialization and Assembly (± 1º C) Storage (± 2.5º C)

kare
Télécharger la présentation

MMF Layout, Workflow Robert Ruland

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MMF Layout, Workflow Robert Ruland • Magnetic Measurements Facility Layout • Workflow • Summary

  2. Layout • Floor plan divided into three functional areas • Magnetic Measurements (± 0.1º C) • Fiducialization and Assembly (± 1º C) • Storage (± 2.5º C) • Test stand lay-out is driven by requirement to match the Earth Magnetic Field conditions in lab to Undulator Hall, i.e. azimuth and gap orientation need to be identical

  3. Moving and Lifting • Forklift is used to move undulator segment in and out storage racks as well as on and off dollies • Dollies are used to move segments between rooms • Cranes are used to load segments on and off benches

  4. Tuning / Fiducialization Workflow • All Undulators are tuned to nominal K, position specific K setting is done by adjusting relative quad-to-und alignment • Tuning / Fiducialization Workflow • In storage area, load dolly with undulator segment • Roll dolly into F&A lab, adjust to temperature for 3 days • Roll dolly into MM lab, adjust to temperature for 7 days • Set-up undulator on bench #2, pre-adjust gap, 2 days • Move onto bench #1, fine-adjust gap, tune, measure pointed magnet fixture offset, 3 days • Move onto CMM, finish fiducialization, 1 day

  5. Cradle Assembly Workflow • Pre-assemble Cradle • Move cradle onto assembly bench • Install quad, vacuum chamber, and BPM • Pre-Align and straighten vacuum chamber • Mount undulator • Align Components • Move assembly onto CMM • Set undulator into nominal position • Set roll-away reference • Align Quad wrt undulator • Align BPM wrt Quad • Adjust undulator relative X-position for local K

  6. END of Presentation

More Related