1 / 1

Total increase in Ai estimated

300. 300. 200. 200. Total increase in Ai estimated. 100. Total increase in Ai estimated. 100. slope = 0.32 r = 0735 p = 0.002. 0. slope = 0.20 r = 0681 p = 0.005. 0. -100. 0. 600. (ml). 400. 200. -100. 0. 200. 400. 600. (ml). increase in FEV 1. A. B. (mm 2 ).

Télécharger la présentation

Total increase in Ai estimated

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 300 300 200 200 Total increase in Ai estimated 100 Total increase in Ai estimated 100 slope = 0.32 r = 0735 p = 0.002 0 slope = 0.20 r = 0681 p = 0.005 0 -100 0 600 (ml) 400 200 -100 0 200 400 600 (ml) increase in FEV1 A B (mm2) (mm2) 300 300 slope = 0.09 r = 0645 p = 0.009 200 200 Total increase in Ai Total increase in Ai estimated 100 100 0 0 -100 -100 0 400 0 600 (ml) 200 (ml) 600 400 200 increase in FEV1 increase in FEV1 C D (mm2) (mm2) increase in FEV1

More Related