1 / 4

Scaling-up Renewable Energy Program SREP Pilot Countries Meeting

This report highlights the experiences of Ethiopia in scaling up renewable energy through the Scaling-up Renewable Energy Program (SREP). During the meeting held in Nairobi from March 5 to 7, 2012, the Ethiopian National Team reported successes in capacity building and coordination efforts with stakeholders. However, challenges arose from insufficient baseline data and the lengthy process of preparing the Investment Plan (IP). The urgency of energy development in Ethiopia, exemplified by the ongoing Grand Ethiopian Renaissance Dam Project, adds to the complexity of the context.

kasa
Télécharger la présentation

Scaling-up Renewable Energy Program SREP Pilot Countries Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Scaling-up Renewable Energy Program SREP Pilot Countries Meeting Nairobi, 05th to 7th March, 2012 Experiences from the Pilot Countries – Ethiopia Case Name:GosayeMegistieAbayneh Email: gosayea@yahoo.com

  2. Successes • The SREP Ethiopia National Team has built its capacity and prepared the IP with technical support from the MDBs • Through the process of IP preparation there was the opportunity to disseminate RE information to a wider stakeholder group and public at large and strong coordination and interfacing with different relevant sector institutions.

  3. Challenges • Lack of sufficient base line data: The indicators including in the Results Framework as currently demanded by the SREP Operational Guidelines are quite challenging to estimate. In some cases, some of the indicators are difficult to be measured realistically. • Lengthy process of IP preparation and exclusion of large hydro in light of the speedy and urgent energy and power sector development need of the country.

  4. The ongoing 5250 MW Grand Ethiopian Renaissance Dam Project The End

More Related