Green Retro fit? Challenges for the ferry industry

Green Retro fit? Challenges for the ferry industry. Per Wimby Stena Line Scandinavia. Stena Line Facts. Turnover 9 000 MSEK Passengers 15,3 millions Cars 2,9 millions Freight units 1,8 millions Employees 5 700 Ships 35 Routes 19. Stena Line route map.

kat
Télécharger la présentation

Green Retro fit? Challenges for the ferry industry

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Green Retro fit?Challenges for the ferryindustry Per Wimby Stena Line Scandinavia MARKIS Uddevalla 30 nov 2011 Per Wimby

  2. MARKIS Uddevalla 30 nov 2011 Per Wimby

  3. Stena Line Facts • Turnover 9 000 MSEK • Passengers 15,3 millions • Cars 2,9 millions • Freight units 1,8 millions • Employees 5 700 • Ships 35 • Routes 19 MARKIS Uddevalla 30 nov 2011 Per Wimby

  4. Stena Line route map MARKIS Uddevalla 30 nov 2011 Per Wimby

  5. Environmental Objectives Stena Line Scandinavia 2011 MARKIS Uddevalla 30 nov 2011 Per Wimby

  6. Experience so far SCR • STENA JUTLANDICA installed 1996, first vessel to have SCR on all ME • AURORA, MERCANDIA IV and VIII all engines • STENA GERMANICA all engines • STENA SCANDINAVICA all engines • Drive is lower Noxand local agreements MARKIS Uddevalla 30 nov 2011 Per Wimby

  7. Twoshipsreplacingfour. • SCR on new ships. • HVSC ReductionofNOx(ton/year)Stena Line in Gothenburg

  8. Experience so far Scrubber • No scrubber installed • Case by case study, no uniform solution. • Case study 4 engine ferry: • Installation about 50 MSEK • 3 weeks off hire 4 MSEK • Running cost 10 MSEK/year • Loss off revenue 10 MSEK MARKIS Uddevalla 30 nov 2011 Per Wimby

  9. Summary Scrubber • Believe that scrubber will do the job, but with reduced revenue and increased running cost. • Challenges: • Weight • Running cost • Installation cost MARKIS Uddevalla 30 nov 2011 Per Wimby

  10. Business opportunity • Industrial partner, reliable equipment • Long term commitment • Better solution at lower cost. MARKIS Uddevalla 30 nov 2011 Per Wimby