EOT Cranes Revamping Conference: Safety Measures & Site Visits

Join the Bidders’ Conference for the Revamping and Replacement of EOT Cranes. Discover safety hazards, preventive measures, and visit schedules at the Prevessinsite and Meyrin site. Ensure access to railways, radiation areas, and proper PPE.

keelie-hays
Télécharger la présentation

EOT Cranes Revamping Conference: Safety Measures & Site Visits

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bidders’ ConferenceIT-3927« Revamping and Replacement of Obsolete EOT Cranes and Supply of New EOT Cranes » Handling Engineering Group

  2. Visit schedule – April 23rd Prevessinsite Meyrin site • 17.15 - 18.00: Visit of PR37 and PR38 (project n. 8) in building 156 Handling Engineering Group

  3. Visit schedule – April 23rd Handling Engineering Group

  4. Visit schedule – April 24th Meyrinsite Handling Engineering Group

  5. Visit schedule – April 24th Handling Engineering Group

  6. Hazards • Access to railways and cranes at ~10 from the ground • Access to radiation areas Handling Engineering Group

  7. Measures • Personal Protective Equipment: safety shoes, helmet • Fall-arrest harness (with lanyard) • Dosimeters (escort only) • All visitors shall be authorized by their employer to work in height and use a harness • All visitors shall be authorized by their employer to work in radioactive areas Handling Engineering Group