1 / 9

First installation of the BullDog™ PVC pipe-to-pipe restraint system occurred on August, 2006.

Case History : City of McKinney, Texas. First installation of the BullDog™ PVC pipe-to-pipe restraint system occurred on August, 2006. Eliminated need for concrete thrust blocking. Case History : City of McKinney, Texas.

Télécharger la présentation

First installation of the BullDog™ PVC pipe-to-pipe restraint system occurred on August, 2006.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Case History:City of McKinney, Texas • First installation of the BullDog™ PVC pipe-to-pipe restraint system occurred on August, 2006. • Eliminated need for concrete thrust blocking

  2. Case History:City of McKinney, Texas The first Bulldog project was part of the City’s Annual Maintenance Program to Replace Substandard Water and Sewer Mains. This project was prioritized because of red water complaints and because the City’s Paving Department was preparing to pave the street.

  3. Case History:City of McKinney, Texas Designed new 1,110 feet of 8” PVC water pipeline offset from existing main. The pipe was DR18, C900. Joint restraint was needed at reducers, bends, and valves.

  4. Case History:City of McKinney, Texas New PVC water line paralleled the existing main. 45-degree offsets used instead of 90-degree bends because the smaller angle generates less thrust force.

  5. Case History:City of McKinney, Texas Using the Bulldog System resulted in: • Successful installations • Less installation time compared to the traditional method • No wait for concrete to cure • No concrete mess or expense • Backfilled and ready for pavement repairs by the end of the day

  6. City of McKinney, Texas: Fabricated Fittings • Installation of BullDog™ PVC fabricated pressure fittings in April, 2007. • Project connected new pipe line to existing pipeline.

  7. City of McKinney, Texas: Fabricated Fittings • PVC fabricated fittings are more easily handled than traditional iron fittings.

  8. City of McKinney, Texas: Fabricated Fittings • New water line alignment shown at the top of the photo. Existing water line alignment shown at the bottom of the photo.

  9. City of McKinney, Texas: Fabricated Fittings • Tying into the existing line.

More Related