1 / 10

AJAC Systems HOTEL RESERVATION SYSTEM

Deliverables III. AJAC Systems HOTEL RESERVATION SYSTEM. Test Results and Final Conclusion. The bulk of the testing was accomplished after the software was installable. The software did not require much testing as it was mostly functional before testing occurred.

keiki
Télécharger la présentation

AJAC Systems HOTEL RESERVATION SYSTEM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Deliverables III AJAC Systems HOTEL RESERVATION SYSTEM

  2. Test Results and Final Conclusion • The bulk of the testing was accomplished after the software was installable. • The software did not require much testing as it was mostly functional before testing occurred. • Some integral tests were ran. • Here are a few of them………………

  3. Failed Test Results • Test Case 8 (Nov 26) • A new guest record is input • Test ran incorrectly • Test Case 11 • Guest Report (Nov 26, Nov 29 – Failed) • Two different people with same name in system caused Guest report to show them in same report • Fixed by adding phone number check • Fixed Dec 1

  4. Test Case 12 – Non-Functional • Mean time between failure validation • MtbF should be less than 60 minutes • Steps • Start the timer • Cold boot the host machine • Load the Access Database • Stop the timer • Expected Results • Less than 60 minutes to complete • PASS

  5. Project Legacy • Roles • Equal work was split up to all group members • Work was split up into documents, coding, and design

  6. Anqi Chen • Breakdown: • Test Plan – 100% • Build Instructions – 100% • Detailed Deign – 25% • High-Level Design – 25% • User’s Manual – 7.5% • Code – 20% (Reports) • Design – 10% • Presentations – 20%

  7. JinLong Fan • Breakdown • Software Requirements Specification – 95% • Detailed Design – 25% • High-Level Design – 25% • Users Manual – 80% • Code – 20% (Forms) • Design – 20% • Presentations – 20%

  8. Andon Coleman • Breakdown: • Project Management Plan – 100% • Software Requirement Specifications – 5% • Detailed Design – 25% • High-Level Design – 25% • Test Results – 100% • User’s Manual – 2.5% • Code – 10% (Misc. Query Logic) • Design – 50% • Presentations – 25%

  9. Chris Steiner • Breakdown • Concept of Operations – 100% • Detailed Design – 25% • High Level Design – 25% • User’s Manual – 10% • Source Code – 100% • Code – 50% (SQL, Visual Basic Code) • Design – 20% • Presentations – 35% • Website – 100%

  10. Analysis • The final delivered product meets all of the initial design requirements • The system is fully functional and deployable. • Slight planning oversights

More Related