1 / 15

WELCOME TO A PRESENTATION ON URBAN PROFILE OF UDAIPUR NAGAR PANCHAYAT

WELCOME TO A PRESENTATION ON URBAN PROFILE OF UDAIPUR NAGAR PANCHAYAT. MATABARI TEMPLE. BASIC DATA. TOTAL AREA 8.67 SQKM TOTAL POPULATION 30,636 TOTAL FAMILY 5536

keita
Télécharger la présentation

WELCOME TO A PRESENTATION ON URBAN PROFILE OF UDAIPUR NAGAR PANCHAYAT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WELCOME TO A PRESENTATION ON URBAN PROFILE OF UDAIPUR NAGAR PANCHAYAT

  2. MATABARI TEMPLE

  3. BASIC DATA TOTAL AREA 8.67 SQKM TOTAL POPULATION 30,636 TOTAL FAMILY 5536 SC POP 3923 ST POP 210 OBC POP 4113 MINORITIES POP 991 GEN. POP 13127 TOTAL ILLITERATE 300 DAILY FLOATING POP 5960

  4. EMPLOYMENT STATUS GOVT 1603 ARTISAN 1113 TRADE 4121 DAILY WAGE EARNERS AND SMALL BUSINESS CONSTITUTE LARGE NUMBERS

  5. INFRASTRUCTURE • SCHOOLS GOVT 17 • PRIVATE 16 mostly pre primary • HEALTH DISTRICT HOSPITAL WITH 135 • BED STRENGTH • ROADS 48 KMS BRICK SOLING AND 14 OF KATCHA • DRAINS 66 KMS • DRINKING WATER 1.3 MGD CAPACITY WATER • TREATMENT PLANT

  6. TOWN HALL 512 CAPACITY • BUS STAND 50 VEHICLES CAPACITY • PARKING FACILITIES 3 AUTOS 250 7 RICKSHAW • NO FACILITY FOR CARS • SLUMS 12 AREAS WITH 5312 Pop • STREET LIGHTING 48 KMS Rs 9.10 LAKHS PER YEAR • SOLID WASTE MANAGEMENT DAILY 7 MT 2.49 acres • BUT DISPOSAL IS ONLY 3-4 MT

  7. WATER BODIES THERE ARE FOUR LAKES OF 59.7 HA AREA REQUIRES IMMEDIATE PRESERVATION AND DESILTATION A PROJECT PROPOSAL WAS SUBMITTED FOR 761.17LAKHS MAIN WORKS PROPOSED ARE DRAINAGE DESILTATION CULVERTS ELECTRIFICATION GREENERY RECREATIONAL FACILITIES

  8. TOURISM • UDAIPUR IS THE TOURIST CAPITAL OF TRIPURA • TEMPLES • PALACES • LAKES • MUGHAL MONUMENTS

  9. IDSMT 2ND PHASE PROPOSALS (Rs in lakhs) • CONST OF NEW MARKET COMPLEX 300 • CONST OF LINK DRAINS 65 • RING ROAD 375 • PLAY GROUND WITH GALLERY 35 • UNEMPLOYED SHEDS 55 • DRINKING WATER 60 • COMMUNITY TOILETS 25 • BUS STAND 90 • ROADS 20 • TRG CENTRE 30 TOTAL 1055

  10. IMMEDIATE REQUIREMENT SURFACE ROADS AMOUNT REQ EXSTING 48 KM ( 30.50 PWD) NEW ROADS REQ 22.3 KM 233 lakhs UPGRADATION 12.4 KM 71 lakhs RING ROAD 5 KM 375 lakhs

  11. CONT …. • DRAINS • EXISTING 66 KM • NEW DRAIN REQUIRED 19 KM Rs 190 lakhs • MAINTENANCE OF DRAINS 16 KM Rs 24 lakhs • BOX CULVERTS • EXISTING 32 • NEW CULVERTS REQ 18 Rs 73.5 lakhs • STREET LIGHTING • EXISTING 71 KMS • EXT. REQ 22 KMS Rs 25 lakhs

  12. CONT.. • TOWN HALL 100 LAKHS • PUBLIC LIBRARY 100 LAKHS • BUS TERMINAL 250 LAKHS • BURNING GHATS 4 100 LAKHS • SLUM DEV 163 LAKHS • SOLID WASTE MGT TECHNOLOGY WITH FINANCE • DEV OF WATER BODIES 761 Lakhs • SLAUGHTER HOUSE 20 LAKHS • WORKING WOMENS HOSTEL 56 LAKHS • ENVIRONMENT AND FORESTRY 37.05 LAKHS

  13. TOTAL REQUIREMENT OF FUND Rs 2578.55 LAKHS PREPARATION OF MASTER PLAN

  14. REASONS FOR INVESTMENT • DISTRICT BORDERS WITH FIVE DISTS OF BANGLADESH • HUGE INFORMAL TRADE • TWO LCSs FOR THE DISTRCT • UDAIPUR IS THE CENTRAL PLACE FOR TRADE AND TRANSPORT • NO INVESTMENT IN THE LAST 50 YEARS • EDUCATIONAL CENTRE • TOURIST CAPITAL OF TRIPURA • THICK POPULATION AROUND THE TOWN • STRONG PRIMARY SECTOR

  15. THANKYOU

More Related