The Economics of Solar Energy. FLS Energy Project Diversity. Comparison of Energy Costs. PV + Solar is the future. PV + Storage grid parity reached. Grid parity reached. Incentive d riven. Biltmore Park Hilton – Asheville, NC. Guilford College. Camp Lejeune – Actus Lend/Lease.
E N D
PV + Solar is the future PV + Storage grid parity reached Grid parity reached Incentive driven
Camp Lejeune • Governor Perdue attends project announcement
Proximity Hotel, GreensboroFirst LEED Platinum Hotel in America
Purchase Model Tax Credits Client FLS Energy RECs
Solar Hot Water System - NC • System Size 60 Solar Thermal Collectors • System Output 3000 Gallons of Hot Water per day • Roof Space Required 4800 square feet • Installation Cost $270,000 • Federal Tax Credits $82,350 Taken 1st Year • State Tax Credits $96,075 Taken over 5 years • Accelerated Depreciation $83,998 Taken over 6 years • Avoided Energy Cost $8,572 Each Year • Sale of REC’s $7,309 Each Year (20 years) • Simple Payback4.2 Years
Photovoltaic System - NC • System Size 100 kW • System Output 131,513 kW hours per year • Roof Space Required 11,059 sf • Installation Cost $550,000 • Federal Tax Credits $165,182 Taken 1st Year • State Tax Credits $192,712 Taken over 5 years • Accelerated Depreciation $168,485 Taken over 6 years • Avoided Energy Cost $6,576 Each Year • Sale of REC’s $17,077 Each Year (20 years) • Simple Payback4.3 Years
Solar Energy Purchase Agreement (SEPA) Tax Credits Client FLS Energy RECs