1 / 4

Joint Command and Control Joint Functional Concept

UNCLASSIFIED. Joint Command and Control Joint Functional Concept. Lt Col Rob Kaufman C2 FCB 9 January 2007. UNCLASSIFIED. Overview of Concept. Military Problem

ken
Télécharger la présentation

Joint Command and Control Joint Functional Concept

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UNCLASSIFIED Joint Command and Control Joint Functional Concept Lt Col Rob Kaufman C2 FCB 9 January 2007 UNCLASSIFIED

  2. Overview of Concept • Military Problem Provide the Joint Force Commander with a seamless, deployable command and control capability that will enable the creation of desired effects at the right time and place to accomplish the mission. This C2 capability should enable Joint Forces to rapidly respond and decisively execute the commander’s intent in a complex, uncertain dynamic operating environment; while fully leveraging interagency support, multinational partners, and non-government organizations. • Scope This functional concept envisions joint C2 in the net-centric environment of 2015 and summarizes how future Joint C2 capabilities will support the Joint Force throughout the full range of military operations (ROMO). The Joint C2 Functional Concept describes how command and control will be performed to achieve success when executing missions and operations described in the Joint Operating Concepts. Though this document focuses on the operational level, the concept applies to C2 across all echelons.

  3. Overview of Concept • Proposed Solution • JC2 JFC update largely a rewrite • Last JFC written from a combined C2/NC perspective • Must incorporate new concepts from C2 CBA & C2 JIC. • CJCSJ 3010.02B-required DOTMLPF implications. • CCJO and JOC updates less significant • C2 FCB out-of-hide effort • Leverage in-house and C/S/A expertise • Balance workload with competing requirements

  4. Way Ahead Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jul 07 • JC2 JFC rewrite underway – First IPT tentatively scheduled for mid-February • Schedule is tight, but Summer 07 completion still feasible • Timeline below lists schedule of events: The below timeline lists the events to occur to rewrite the JC2 JFC Commence review, validation, and approval process (FCB, JCB, JROC, Tank) 1st IPT with C/S/A (mid-February) 2nd IPT with C/S/A Red Team review Develop straw man for 1st IPT (9-11 Jan 07) Staff document in KM/DS UNCLASSIFIED