An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. B163 - FRESCA Arjan Verweij, AT-MAS, Workshop on test facilities and measurement equipment needed for the LHC exploitation , 12 April 2006

  2. General • Fresca was built in 1995-1998 and has been operational since then. • Presently run by 2 staff, 1 PT support and also used by one PhD. • FEATURES: • 88 mm dipole up to 10.3T (at 1.9 K), housed in an independently cooled cryostat. • Test volume of about 600 mm x 70 mm  • Samples (NbTi, Nb3Sn) up to cross-section of about 35x35 mm2 can be measured under pressure in a sample holder. • Sample current with external 32 kA PS or internal s.c. transformer (>36 kA). • Possibility of up to 200 measurement wires. • Automatic data acquisition for most of the tests. • Measurement devices: 4 ch x 1 MHz, 16 ch x 100 kHz, 32 ch x 200 kHz acquisition, 30 ch x 10 Hz Arjan Verweij, AT-MAS, Workshop on test facilities and measurement equipment needed for the LHC exploitation , 12 April 2006

  3. Type of measurements • UI-measurements (as function of B, B-direction, T and dI/dt)  Ic, Iq, n-value • UB-measurements (as function of I, B-direction, T and dB/dt) flux jump stability • RRR measurement (as function of B if needed) • Measurement of the self field along the cable  transport current distribution among the strands, BICCs • Measurement of splice/joint resistances (accuracy better than 0.05 nW) • Measurement of (Minimum) Quench Energy (as function of B, I, T, heater position, heat pulse duration) • Measurement of quench velocity (as function of B, T) Arjan Verweij, AT-MAS, Workshop on test facilities and measurement equipment needed for the LHC exploitation , 12 April 2006

  4. Programs for coming years • LHC reception (4 cool-downs): • measurements on samples of final cable deliveries • Target: approve final cables of the LHC contracts • LHC feedback program (4 ? cool-downs per year): • LHC NbTi cables (01x-07x) • Target: Perform any type of measurement that could help to better understand magnet (quench) behaviour of the LHC magnets • Splice-uniformity program (4 cool-downs): • Measurement of Ic, Iq and n as function of B,T,dI/dt • Joints with lengths of 4, 6, 8, 10, 12 cm • Target: understand to what extent non-uniform joints/splices influence the electrical characteristics of a cable. Arjan Verweij, AT-MAS, Workshop on test facilities and measurement equipment needed for the LHC exploitation , 12 April 2006

  5. Programs for coming years • MQE program (10 long cool-downs per year): • various Ra and Rc, • with/without core, impregnation, soldering etc • NbTi with Cu or resistive matrix • Target: understanding beam loss sensitivity, validation & optimization of cables for new applications (cycled magnets, ...), PhD work G. Willering • GSI-MQE program (3 long cool-downs): • 3 cored NbTi cables with low/medium/high Ra • Target: understanding if Ra has to be as small as possible in order to imrpove stability • Nb3Sn, Nb3Al program (4 long cool-downs per year): • FermiLab, Twente, NED? • RRP, PIT, (M)JR, RHQT • Target: Flux jump stability, MQE, Ic(B,T)  cable degradation, pressure dependence? Arjan Verweij, AT-MAS, Workshop on test facilities and measurement equipment needed for the LHC exploitation , 12 April 2006

  6. Programs for coming years • Cold-weld program (4 cool-downs): • Measurement of Ic, Iq and n as function of B,T,dI/dt • Cable samples with 1, 4, 10, 18 cold welds • Target: understand to what extent cold-welds influence the electrical characteristics of a cable. • Transformer program (3 cool-downs): • increase the current of the transfomer (towards 50 kA) • improve the accuracy of the regulation and measurement system. • Target: reduce helium consumption, and enable testing of Nb3Sn cables to higher currents Arjan Verweij, AT-MAS, Workshop on test facilities and measurement equipment needed for the LHC exploitation , 12 April 2006