MS results – IT 3684. by Elena Perez Rodriguez. Index. Firms contacted Summary of the results Idom Herco Telstar Discussion. Summary of the results. 69 firms where contacted form 17 European countries. 8 firms answered the Market survey. 5 firms have been qualified.
E N D
MS results – IT 3684 by Elena Perez Rodriguez
Index • Firms contacted • Summary of the results • Idom • Herco • Telstar • Discussion Thermosiphon project
Summary of the results • 69 firms where contacted form 17 European countries. • 8 firms answered the Market survey. • 5 firms have been qualified. • 1 firm has to be discussed. • 2 firm are non qualified. Thermosiphon project
Summary of the results Thermosiphon project
Idom • Criteria that is not fulfilled • Provide at least two references of successful design, construction, installation and commissioning of similar chiller installations done in the last five years. The references provided are out of scope. Thermosiphon project
Herco • Criteria that are not fulfilled • Provide at least two references of successful design, construction, installation and commissioning of similar chiller installations done in the last five years. The references provided are out of scope. • 15 FTE (full time equivalents) engineers and technicians in the design and construction of cooling systems during the last three years The number of people in the firm is 9 ÷ 5 FTE They have never done cascade systems Thermosiphon project
Telstar • Criteria that is not fulfilled • Provide at least two references of successful design, construction, installation and commissioning of similar chiller installations done in the last five years. Only ONE reference provided • They have only • done cascade • systems once Thermosiphon project
Discussion Qualified suppliers Thermosiphon project