1 / 5

NIRESI A FAINTEST OBJECT NEAR IR SPECTROGRAPH FOR KECK T.SOIFER & K. MATTHEWS

NIRESI A FAINTEST OBJECT NEAR IR SPECTROGRAPH FOR KECK T.SOIFER & K. MATTHEWS. SCIENTIFIC / TECHNICAL OBJECTIVES . FAINT OBJECTS EROs associated w/SCUBA, OTHER SURVEYS RED OBJECTS FOUND IN SIRTF SURVEYS

kerem
Télécharger la présentation

NIRESI A FAINTEST OBJECT NEAR IR SPECTROGRAPH FOR KECK T.SOIFER & K. MATTHEWS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NIRESI A FAINTEST OBJECT NEAR IR SPECTROGRAPH FOR KECK T.SOIFER & K. MATTHEWS

  2. SCIENTIFIC / TECHNICAL OBJECTIVES • FAINT OBJECTS • EROs associated w/SCUBA, OTHER SURVEYS • RED OBJECTS FOUND IN SIRTF SURVEYS • THIS IS OUR MAIN SCIENCE OBJECTIVE, ESTABLISHING Z FOR SIRTF SOURCES WHERE OPTICAL SPECTRA ARE IMPRACTICAL, NEED FULL 1-2.4um COVERAGE • SPECTRA AT ULTIMATE SENSITIVITY OF KECK SPANNING ENTIRE 1-2.4um RANGE AT ONE TIME • NIRSPEC REQUIRES 5 GRATING SETTINGS TO COVER ENTIRE 1-2.4UM RANGE AT R~2000

  3. WHAT WE PROPOSE TO PROVIDE • SPECTROMETER, ELECTRONICS (SEE MATTHEWS PRESENTATION) DELIVERED TO KECK OBSERVATORY AT NO COST TO CARA • WE’VE DELIVERED 2 INSTRUMENTS TO KECK • WE KNOW THE INTERFACES • WE WILL MAKE IT AVAILABLE TO THE ENTIRE KECK COMMUNITY AS A GENERAL USER INSTRUMENT (KECK TO SUPPORT)

  4. BENEFIT /COST TO KECK BENEFITS • NEW STATE-OF-THE-ART INSTRUMENT FOR KI • KI COMPLEMENT – NIRC+LWS, LRIS,HIRES • REDUCES PRESSURE ON KII COST • BENT CASS FOCUS IMPLEMENTED ON KI • MOVE FROM KII IS LEAST EXPENSIVE METHOD • SUPPORT TO KECK COMMUNITY • KECK WILL HAVE TO PROVIDE DOCUMENTATION FOR USERS, INSTRUMENT SPECIALIST, CONSUMABLES (NITROGEN)

  5. WHAT WE EXPECT/NEED • INSTRUMENT COST IS PRIMARY DRIVER • WE HAVE NO RESOURCES FOR MODIFYING DESIGN TO ADD ANY NON-ESSENTIALS • WE NEED TO COMMIT SIGNIFICANT $ SOON IF WE ARE TO PROCEED • WE REQUEST COMMITMENT FROM CARA TO SUPPORT THIS INSTRUMENT WHEN DELIVERED • WORK TO COMMENCE AT KECK ~ 6 MO BEFORE WE BELIEVE WE’LL BE READY TO DELIVER • WHEN WE DELIVER, WE’LL NEED ENGINEERING TIME FOR COMMISSIONING [NIRC, NIRC2 WORKED ON THE FIRST NIGHT THEY WERE OPENED TO SKY]

More Related