50 likes | 54 Vues
WP5 – Case studies. ESSnet SAE project meeting Neuchatel, 7-8 July 2011. Time line WP5. Draft WP5 reports. 1st draft, 12 May 2011 Contributions from France, Italy, Netherlands, Norway, Spain, Switzerland 2nd draft, 4 July 2011 Updates from these NSI’s (Germany and Poland still missing)
E N D
WP5 – Case studies ESSnet SAE project meeting Neuchatel, 7-8 July 2011
Time line WP5 Neuchatel 2011 – ESSnet SAE, WP5
Draft WP5 reports • 1st draft, 12 May 2011Contributions from France, Italy, Netherlands, Norway, Spain, Switzerland • 2nd draft, 4 July 2011Updates from these NSI’s (Germany and Poland still missing) • Still to come • General introduction, discussion and conclusion • Final versions of all case study reports Neuchatel 2011 – ESSnet SAE, WP5
WP5 schedule 2011 • Case study first drafts to NL < 15 April 2011 • Draft report for Eurostat < 30 April 2011 • Advanced drafts < Neuchatel meeting, July • Final case study reports to NL < 30 Sep 2011 • Final WP5 report ready < month 22 (31 Oct) Neuchatel 2011 – ESSnet SAE, WP5
Issues • Do not use page numbers • Format of contributions: latex or Word? • +/- uniform in length: number of pages? • Reviewing each others contributions? Neuchatel 2011 – ESSnet SAE, WP5