International Outreach Overview TRB Annual Meeting, 2007

International Outreach Overview TRB Annual Meeting, 2007. SHRP 2. Targeted, short-term program of strategic highway research modeled on the first SHRP Authorized by Congress in 2005 Administered by TRB in cooperation with AASHTO and FHWA

kiet
Télécharger la présentation

International Outreach Overview TRB Annual Meeting, 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. International Outreach Overview TRB Annual Meeting, 2007

  2. SHRP 2 • Targeted, short-term program of strategic highway research modeled on the first SHRP • Authorized by Congress in 2005 • Administered by TRB in cooperation with AASHTO and FHWA • Integrates multiple fields of study to address critical needs

  3. Safety • Goal: to prevent or reduce the severity of highway crashes by understanding driver behavior. • Use of vehicle-based and site-based technologies to gather pre-crash, crash, and exposure data.

  4. Renewal • Goal: to renew aging infrastructure through rapid design and construction methods that cause minimal disruption and produce long-lived facilities. • Integrated approach involving engineering, finance, contracting, planning, safety, maintenance, customer relations.

  5. Reliability • Goal: to reduce congestion through incident reduction, management, response, and mitigation. • Integrated approach involving data, analysis, institutional architectures, tools, and operational strategies.

  6. Capacity • Goals: to integrate mobility, economic, environmental, and community needs into the planning and design of new highway capacity. • Systems approach involving fundamental knowledge, data, tools, institutional issues.

  7. Funding and Time Frame • $150 million, expended over 7 years • April 2006 through March 2013 • $108 million of research contracts: • Safety: $43.2 million • Renewal: $28.8 million • Reliability: $18 million • Capacity: $18 million

  8. Stakeholder Governance • Oversight Committee (OC) to guide whole program • Technical Coordinating Committees (TCCs) for each focus area • Expert Task Groups (ETGs) prepare RFPs, review proposals, and provide technical advice on special tasks

  9. International Outreach:Objectives • Access an expanded research community • Build on pre-existing or concurrent research • Limit non-productive repetition • Disseminate results more widely

  10. Policy Resolutions • Encourage International Participation on Contract Research Teams • International “Loaned” Staff • International Coordinators • Collaborative and Cooperative Research

  11. International Involvement To Date • Derek Sweet—provided by Canadian Council of Transportation Deputy Ministers, first “loaned” staff • International researchers on proposing teams • Roundtable meeting with ECTRI • Exploratory meeting with FEHRL (January 22)

  12. Contact SHRP 2Derek Sweet, International Coordinator • By email DSweet@nas.edu • By telephone at 202-334-1330 • Visit www.TRB.org/SHRP2