TRIMESTER SCHEDULING. Trimester Study Team Goals. Develop a schedule that would enable students to meet the new Michigan Merit Curriculum requirements Promote rigorous course selections Build in academic support for the students who need it

1 / 19

Télécharger la présentation

TRIMESTER SCHEDULING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. TRIMESTER SCHEDULING

  2. Trimester Study Team Goals • Develop a schedule that would enable students to meet the new Michigan Merit Curriculum requirements • Promote rigorous course selections • Build in academic support for the students who need it • Provide students the opportunity to enroll in elective courses

  3. Trimester Study Team Tasks • Conduct visitations • Research information through the internet • Attend workshops • Hold conversations with districts who have used the trimester schedule • Evaluate our findings • Consider the needs of all stakeholders

  4. High School Schedules Considered • Traditional Day – (two 90 day semesters, ½ year courses, 6 periods, 5 period teaching assignment) • 7-8 Period Day – (same as above, 5 or 6 period teaching assignment) • 4 X 4 Block Schedule – (4 90 minute classes, change at semester, meet on alternating days, several hybrids of this schedule in use) • ABC Rotating Day – (4-8 periods rotate at different times each day of week, periods vary in length of time) • 3 X5 Trimester - (5 classes per day, 3 semesters, longer class periods, 4 period teaching assignment)

  5. Trimester Schedule Basic Facts • School year is divided into 3 trimesters (terms) with each term being approximately 60 days in length • Students take 5 classes per term that meet daily • Classes that meet for one term are equivalent to a one semester class • Classes that meet for two terms are equivalent to a year long class • Some classes might meet for 3 terms • Students have the potential to earn 7.5 credits per year

  6. Trimester Schedule Advantages • More choice for students (7.5 credit options) • Possibility of 1.5 credit classes (AP, Music) • Reduced daily student/teacher load • More credit recovery possibilities • More credit acceleration possibilities • Less stress/more time to build relationships • Students and teachers deal with fewer classes per term • Instructional time is similar to our current schedule • Aligned with athletic schedules • No final exams following a major break

  7. Trimester Schedule Test Analysis

  8. Districts Using/Studying Trimester Scheduling

  9. Trimester Schedule Considerations • Staffing issues (i.e. costs, highly qualified) • Effect on 8/9 core curriculum • Teachers’ contract • School calendar/daily time schedule • Scheduling software • Prorating of graduation credits • Curriculum compacting and instructional pacing • Daily time schedule conflict with OTC/OSM Tech • Staff “buy-in” to concept • Classes that will meet for 3 terms • Transition issues • Standardized testing timeline/window

  10. Trimester Schedule Staffing (CHS) • Staffing formula • 1878 students x 15 courses over 3 semesters = 28,170 seats over full year ÷ 29.0 student/teacher ratio = 971 sections for full year ÷ 12 (4 classes taught each semester) = 80.9 FTE (78.0 current FTE) = +2.9 FTE needed • 29.5 student/teacher ratio = +1.5 FTE needed • 30.0 student/teacher ratio = + .2 FTE needed

  11. Trimester Schedule Comparison

  12. Trimester Sample Schedule

  13. Trimester Sample Schedule (Typical General Ed Student)

  14. Trimester Sample Schedule(College Bound)

  15. Trimester Sample Schedule(Advanced Placement/Music)

  16. Trimester Sample Schedule(Recovery/Support)

  17. Trimester Sample Time Schedule (75 minute classes) • 1st Hour 7:50am - 9:05am • 2nd Hour 9:11am – 10:26am • 3rd Hour 10:32am – 12:18pm (includes 3 lunch periods) • 4th Hour 12:24pm – 1:39pm • 5th Hour 1:45pm – 3:00pm

  18. Trimester Sample Time Schedule (72 minute classes) • 1st Hour 7:50am – 9:02am • 2nd Hour 9:08am – 10:20am • 3rd Hour 10:26am – 12:09pm (includes 3 lunch periods) • 4th Hour 12:15pm – 1:27pm • 5th Hour 1:33pm – 2:45pm

  19. Trimester Sample Calendar (07/08) • Fall Trimester 9/04/07 – 11/28/07 • Winter Trimester 11/29/07 – 3/05/08 • Spring Trimester 3/06/08 – 6/06/08 Note: each trimester is 60 days in length