An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DOE Office of Environmental Management GREENING, MAINTAINING AND DISPOSITIONING EM’S REAL PROPERTY ASSETS Donna Green Office of D&D and Facility Engineering June 13, 2011

  2. Outline • EM Background • Mission • Facilities • Deactivation and Decommissioning (D&D) • ARRA Accomplishments: Footprint Reduction • Maintenance Program Reviews • EM Sustainability • PerformanceStatus • Challenges • Path Forward • High Performance Sustainable Building Strategy • Summary • Questions

  3. EM Mission “Complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development, production, and Government-sponsored nuclear energy research.” • Largest environmental cleanup effort in the world, originally involving two million acres at 108 sites in 35 states • Safely performing work in challenging environments • Involving some of the most dangerous materials known to man • Solving highly complex technical problems with first-of-a-kind technologies • Operating in the world’s most complex regulatory environment • Supporting other continuing DOE missions and stakeholder partnerships

  4. EM Mission: Program Priorities • Essential activities to maintain a safe, secure, and compliant posture in the EM complex • Radioactive tank waste stabilization, treatment, and disposal • Spent nuclear fuel storage, receipt, and disposition • Special nuclear material consolidation, stabilization, and disposition • High priority groundwater remediation • Transuranic (TRU) and mixed/low-level waste disposition • Soil and groundwater remediation • Excess facilities deactivation and decommissioning (D&D)

  5. Locations of Major EM Sites Hanford Reservation Idaho National Lab Portsmouth/Paducah Project Office Oak Ridge - ETTP Savannah River Site Carlsbad - WIPP

  6. Facilities: EM Real Property Assets

  7. EM Footprint Reduction to Date The graph below shows EM footprint reductions through FY 2010 and planned reductions due to disposal in FY2011 and FY2012. It does not reflect new construction or transfers into EM.

  8. Deactivation and Decommissioning (D&D) • D&D: The process of taking an active/excess/abandoned facility to a final disposition end state. D&D presents unique hazards that must be addressed from a safety, programmatic, environmental, and technological standpoint due to residual radioactivity, and other hazardous constituents, and the physical condition of EM’s facilities. • These facilities contain many complex systems (e.g. ventilation), miles of contaminated pipelines, glove boxes, and unique processing equipment that require labor intensive deactivation and decommissioning methods. • More information about DOE’s D&D program: www.em.doe.gov/pdfs/DDMaps.aspx

  9. ARRA Program Funding • Will demolish more than five million square feet of facilities by end of FY 2011 • Will demolish more than six million square feet of facilities by end of FY 2012 • Many of these facilities are not at EM sites EM Received $6 Billion in Recovery Act Funding - $3.32 Billion Allocated to D&D, Greatly Accelerating D&D over EM Baseline

  10. ARRA Program Performance Metrics CH TRU Waste Processed (Certification Ready) 4,036 m3 3,824 m3 6,485 m3 CH TRU Waste Certified for Final Disposal 2,224 m3 2,226 m3 3,740 m3 2,959 m3 Transuranic Waste Dispositioned from Inventory 2,790 m3 7,888 m3 3 sites TRU Small Quantity Site Completions 3 sites 8 sites 78,925 m3 LLW/MLLW Disposed (Legacy and NGW) 72,498 m3 81,301 m3 Facility Square Footage Demolished 4,201,775 sq. ft. 2,296,841 sq. ft. 6,103,207 sq. ft. 180 facilities Facility Completions 155 facilities 261 facilities Mill Tailings Disposed (Moab) 2,184,252 tons 1,762,235 tons 2,004,035 tons 120% 0% 20% 40% 60% 80% 100% Actual to Date (3/31/11) Target to Date (3/31/11) ARRA Total

  11. Base Program FY 2011 Metrics 375,000 gallons Liquid Waste eliminated 508,000 gallons 892,000 gallons 140 containers HLW packaged for disposition 158 containers 311 containers 1,142 m3 CH TRU Waste Certified for Final Disposal 1,151 m3 1,943 m3 1,832 m3 Transuranic Waste Dispositioned from Inventory 2,728 m3 5,984 m3 LLW/MLLW Disposed (Legacy and NGW) 10,691 m3 7,475 m3 14,297 m3 34 facilities Facility Completions 47 facilities 121 facilities 26 release sites Remediation Complete 23 release sites 188 release sites 369,106 tons Mill Tailings Disposed 346,430 tons 692,860 tons 100% 0% 20% 40% 60% 80% FY 11 Actual to Date (3/31/11) FY 11 Target to Date (3/31/11) FY 11 Total Target

  12. Land Footprint Reduction Status

  13. EM Maintenance Program Reviews • Purpose • Meet EM responsibilities for oversight and awareness • Verify compliance with DOE Order 430.2B • Assess site programs for maintaining safe operating conditions at shut-down facilities • EM-Headquarters and Field Offices jointly conducted reviews at: • Hanford • WIPP • Savannah River

  14. Maintenance Program Review Results • Results • Site maintenance programs are well managed • Field Offices and Contractors have a good understanding of maintenance needs • DOE corporate maintenance metrics for EM do not consistently reflect site conditions • EM has many beyond-design-life facilities and recapitalization investments have been limited • EM Guidance and site policies for surveillance of shut-facilities are generally implemented to ensure that critical maintenance needs are identified and addressed.

  15. EM Maintenance Metrics Source: a – 2010 FIMS Snapshot, January 2011 b - 2010 FIMS Snapshot, EM Operating Facilities Only c – 2010 IFI Crosscut budget

  16. EM Real Property Improvements • EM sites continue to improve the quality of data in the FIMS database • Adding facilities to FIMS • Improving accuracy of replacement plant value estimates • Improving quality of Condition Assessment Surveys and resulting deferred maintenance estimates • Savannah River replaced a forty year old coal-fired boiler with a new energy-efficient biomass cogeneration facility through an ESPC • EM may have more opportunities to recapitalize infrastructure through ESPC and similar mechanisms

  17. EM FY2010 Sustainability Performance While completing significantly increased mission work: • Met energy and water intensity reduction goals • Slight decrease in Scopes 1 and 2 greenhouse gas (GHG) emissions • Minimal increase in Scope 3 GHG emissions • Nearly 40 percent increase in fleet petroleum use over FY2005 • No buildings meet the High Performance Sustainable Building (HPSB) Guiding Principles

  18. EM Greenhouse Gas Reduction Challenge

  19. EMSustainability Path Forward Broaden our risk management considerations to include greenhouse gas emissions and resource consumption in our decision making • Consider green remediation where appropriate • In addition to potential reduction in fossil energy use, green remediation offers the potential for reduced water use, improved storm water management, and soil sequestration of carbon • Consider in-situ decommissioning (entombment) where appropriate • Use HPSB Guiding Principles as opportunity to reduce lifecycle costs and GHG emissions • Pursue ESPCs, UESCs, and similar third party financing mechanisms to recapitalize infrastructure and meet sustainability goals

  20. In-Situ Decommissioning (ISD) • ISD is the permanent entombment of a contaminated facility • ISD Projects • Savannah River P-Area Production Reactor • Hanford U-Plant Canyon • Idaho National Lab • 125 to 200 potential facilities • $2.5 to $4 billion savings • 900 to 1900 thousand metric tons CO2 avoided Before After

  21. EM HPSB Strategy • EM has few new buildings coming on line and will mainly need to address existing buildings - possibly including shut down and process buildings • Approximately 50% of the Guiding Principles are to establish and implement site-wide policies, plans, or specifications • EM sites implement most of the green procurement and waste minimization requirements and can take credit for existing programs • Many Guiding Principles do not apply to non-occupied buildings • Guiding Principles that do apply to non-occupied buildings can be valuable tools to reduce life-cycle costs and GHG emissions • HPSB Guiding Principles are consistent with EM’s environmental protection mission

  22. Summary • EM’s mission supports DOE’s sustainability goals • EM assets are well-maintained considering age • EM sites continue to improve the quality of FIMs data • HPSB Guiding Principles can be tools to reduce GHG emissions and life-cycle costs • ESPC and similar financing mechanisms might help EM meet its sustainability goals and recapitalize its infrastructure

  23. Questions Contact Information: Donna Green Supervisor Office of Deactivation & Decommissioning and Facility Engineering Office of Environmental Management Department of Energy 202-586-1467 fax: 202-586-1492 E-mail: donnal.green@em.doe.gov For More Information: Office of Deactivation & Decommissioning and Facility Engineering http://www.em.doe.gov/EM20Pages/DDFE.aspx D&D Maps: http://www.em.doe.gov/pdfs/DDMaps.aspx