An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UCRs 007 UCR Schedule Transition when Phase or Sub-phase begins on or after March 1, 2007 Eliminated codes for M0008 Technician I & M0013 Draftsman Professional travel reimbursed at full hourly rate Mileage reimbursed up to 500 miles R/T Clarified professional descriptions

  2. UCRs 007 UCR Schedule Reimburse “last load minimum” Reimburse minimum soil treatment charge Codes M codes – Material codes T codes – Task codes X codes – Use when there is no M, T, or C code C codes – No UCR A codes – Adjustment code; last load minimums

  3. UCRs A Code: Example Hauling company has a 22 tn minimum 30 tons hauled to soil treatment facility Hauling company bills 44 tons (30 tons plus 14 tons) to achieve 22 ton minimum Pre-approve hauling 30 tons using T075 & T076 Additional 14 tons listed as A-code (A001) Invoice from hauler identifying minimum charge must be submitted with claim Invoiced amount plus up to 18.5% eligible for reimbursement

  4. UCRs Codes New number assigned if the standard changed UCR “crosswalk” posted on Petroleum Program web page T012 - Soil Treatment ≥ 250 tons; must bid soil transport and disposal Reimburse small quantities; minimum charge Claim minimum charge as an X-code

  5. UCRs T040 – General Project Management More clearly defined what’s in, what’s out Project planning Scheduling staff and subs Contracting with subs & vendors Routine meetings with RP General correspondence with case manager Not public meetings or meetings with officials

  6. UCRs Claim Prep T064: most regulated tanks - $275/phase or sub-phase T114: heating oil tank & claims with < 10 lines - $100/claim, phase, or sub-phase T100 – Report Preparation More detailed description Explanation of what is included in the Task

  7. UCRs 007 UCRs Identified costs for the consulting business that impact the UCRs Liability Insurance Financing/Carrying Cost Sales Tax Rental Insurance/Damage Waiver Shipping/Delivery Fees Profit

  8. UCRs UCRs are grouped by variable (percentages) Professional Labor Equipment – Meters Remediation Systems Disposal Per Diem Rolling Stock Laboratory C codes Remediation Components Bid items & X codes Subcontractor Labor/Services Base cost was adjusted to reflect cost of business

  9. UCRs Example: the base cost for items grouped as Remediation Systems were adjusted 38.5% Liability Insurance - 1.5% Financing/Carrying Cost – 4.5% Sales Tax – 5.0% Profit – 12.5% Rental Insurance/Damage Waiver – 15.0%

  10. UCRs Mark-up The difference, as a percentage, between the cost of an item or service and what the client is charged or claimed from the Fund Mark-up is limited: A code - 18.5% C code - 6.0% X code - 16.0% Bids - 16.0% UCRs for T & M codes include mark-up

  11. UCRs Laboratory & Soil Treatment Costs Base costs are diverse Incentive for continued cost savings that the program can share Savings Pass Along Invoiced amount plus one-half the difference between the UCR and the invoiced amount Lab and soil treatment costs will be reimbursed: Invoiced cost + 18.5% ≤ the UCR, or Invoiced cost + ½ (UCR – Invoiced cost) ≤ UCR

  12. UCRs M1376 – UCR $91.56/sample Lab invoiced cost is $60 $60 + 18.5% = $71.10 max allowable reimbursement without Savings Pass Along Savings Pass Along = Cost + ½ (UCR-Cost) $60 + ½ ($91.56 - $60) = $60 + $15.78 = $75.78 Claim $4.68 (6.5%) more than $71.10 Fund saves $15.78 over the UCR

  13. UCRs T012 – UCR $32/ton Treatment facility invoiced cost $16 $16 + 18.5% = $18.96max allowable reimbursement without Savings Pass Along Savings Pass Along = Cost + ½ (UCR-Cost) $16 + ½ ($32 - $16) = $16 + $8 = $24 Claim $5.04 (32%) more than $18.96 Fund saves $8 over the UCR

  14. UCRs 18.5% UCR < + _ or UCR (UCR - ) < 1/2 + _ Invoiced amount plus one-half the difference between the UCR and the invoiced amount up to the UCR

  15. UCRs Sub-Phases What are Sub-phases? Post Site Characterization Monitoring CAP Implementation Quarterly claims 007 – 4 CAP-Imp or PSCRM claims per year All other schedules – 2 CAP-Imp or PSCRM claims per year Max of 4 claims per year *

  16. UCRs Transition Site in CAP-Imp with reimbursement period, 11/1/06 – 4/30/07; finish work on this AAF New AAF, UCRs, & sub-phases after 3/1/07 CAP-Imp sub-phase pre-approved 5/1/07 CAP-Imp sub-phase pre-approved 8/1/07 In calendar year 2007 File one 198 claim for reimbursement period 11/1/06 - 4/30/07 File two sub-phase claims, one for each quarter, 5/1/07 to 7/31/07 & 8/1/07 to 10/31/07 Claims with costs from different UCR schedules must be in separate claims

  17. UCRs 007 UCR Updates Annual evaluation T & M codes updated based on CPI Mileage based upon IRS rate Transition to CPI adjusted rates Pre-approval date after April 1 on AAF Comprehensive update every 5 years New base rates