An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CITY COUNCIL GOALS & OBJECTIVES

  2. TOP PRIORITY

  3. Street Valley Gutters • 33 installed by Public Works • 35 installed by contractor • Pipe Replacement Program • 34 replaced by Public Works • 55 replaced by contractor • 6 major street crossings replaced • Swales • Rehabilitation – 10 miles • 6 Months Response to Complaints – 70 miles • Water Reuse System Master Plan • Final draft under review – present to City Council June 2011

  4. CRA for Northeast • Incorporated in Prosperity 2021 Strategic Plan • Request for Qualifications received and evaluated • Contract presented to City Council for approval June 2011 • Stormwater System Hydraulic Modeling • 2 Sections completed • 2 Additional Sections – near completion • Road Resurfacing (50 miles) • 2010 program completed • 2011 program contract let – construction Summer 2011

  5. Neighborhood Signs and City Gateway • Standard prototype design completed • Country Club Cove neighborhood sign completed • Palm Coast Parkway east entrance • Panther installed and dedicated • Under design • Construction – pending funding • City trail signage plan and map completed (Trek It Out) • Repair uplighting and fountains at I-95/Palm Coast Parkway • Continued implementation of South Belle Terre Median improvements • Community Center Concept Plan • Completed

  6. City Economic Development and Incentive Policy • Prosperity 2021 Strategic Plan completed • See Executive Summary for status of individual projects • Video Cameras/Emergency Phones for Parks and Paths • Ralph Carter – completed • Heroes Park – out to bid • Holland Park – under design, construction pending funding • Future improvements pending funding • Stormwater Utility Ordinance • Ordinance adopted • Implementation underway

  7. HIGH PRIORITY

  8. Coquina Coast Saltwater Desalination Project • Phase II-A preliminary design underway and scheduled to be completed Fall 2011 • Phase II-B preliminary design, final design and construction pending funding • Matanzas Woods Interchange (Flagler County Project) • Preliminary design underway • FiberNET: Expansion • Contract with Hospital signed and implemented • Contract with School District approved – implementation Summer 2011 • Contract with O2 Secure Wireless signed • Completed numerous miscellaneous expansion projects to individual businesses - ongoing

  9. Accessible Police Substation: Direction • No plans at this time to relocate or add Sheriff substation in Palm Coast • Commercial Area Strategy • Incorporated into Prosperity 2021 Strategic Plan • Old Kings Road 4-Laning (North of Palm Coast Parkway) • PD&E study underway and is scheduled to be completed by Fall 2011 • Final design – FDOT funding in 2013 • Construction – pending funding • City Hall • Preliminary concept developed and presented to community • Additional detail information pending

  10. Beachside Sewer System • Under design • Agreement with County pending • Construction in 2011/2012 • Pre-Permitting and Speculative Building Ordinance • Incorporated into Prosperity 2021 Strategic Plan • Requests for letters-of-interest sent to business park owners • Roberts Road Business Park Strategy • Incorporated into Prosperity 2021 Strategic Plan • Request for Qualifications received and evaluated • Contract to be presented to City Council for approval June 2011

  11. MODERATE PRIORITY

  12. Neighborhoods Assessment and Plan • Incorporated in Prosperity 2021 Strategic Plan • Implemented abandoned property enforcement program • Neighborhood Stabilization Phase I implemented • Neighborhood Stabilization Phase III approved and implementation initiated • CDBG Grant for home improvements approved • Contract for Northeast area plan pending approval June 2011

  13. Concept Plan of FPL Easement (Belle Terre Parkway/ Royal Palms Parkway) for Recreational Uses • Draft concept plan developed and presented to FPL for approval • Concept plan to be presented to City Council Summer 2011 • Parks and Recreation Fee Structure • Proposed structure completed • To be presented to City Council June 2011 • Building, Permitting and Inspection Processes: Simplification/Streamlining • Completed

  14. MAJOR PROJECTS

  15. Indian Trails Sports Complex • Driveway extension • Design completed • Construction - Summer 2011 • Storage Building • Under design • Construction - Fall 2011 • North Pavilion Concession Stand • Design completed • Construction - Fall 2011 • Central Park Improvements (Phase II B) • Design completed • Construction - Summer 2011

  16. Bridge Rehabilitation Program • Club House Waterway (Palm Harbor Pkwy. near marina) • Substantially complete • College Waterway (Palm Harbor Pkwy. near Yacht Club) • Under design • Construction - pendingfunding • Old Kings Road (South)/Lehigh Trail/Town Center Boulevard Intersection Realignment • Project on hold – private development driven • Graham Swamp Trail (Phase I) • Completed

  17. Belle Terre Parkway Multi-Purpose Path • Phase I completed • Phase II substantially complete • Phase III contract let – construction Summer 2011 • Ravenwood Drive and Whiteview Parkway Multi-Purpose Path (Phase I) • Completed • Canal Control Structure (one replacement per year) • BA-1 Weir completed • Rippling Waterway completed • Ditch 10 completed • Crandell Cove completed • Big Mulberry Creek completed

  18. Bulldog Drive • PD&E completed • Under design • Construction - Summer 2012 • Water Distribution System Improvements: Citation Boulevard to Old Kings Road Loop • C ontract approved • Construction - Summer 2011??? • Waterfront Park • Completed • Children’s Memorial Garden on FIND Linear Trail System • Completed

  19. Royal Palms Parkway Pedestrian Path and Left Turn Lane at Point Pleasant Drive • Completed • Easthampton Boulevard Multi-Purpose Path • Completed • Belle Terre Parkway Median Landscape and Irrigation • 2010 Phase completed • 2011 – Construction – Summer 2011

  20. OTHER MAJOR ACCOMPLISHMENTS

  21. Guardrail Safety Improvements • Ongoing city-wide improvements as needed • Pavement Marking • 2010 program completed • Current year program to be completed in summer 2011 • North Pine Lakes Parkway Improvements • Design to be completed in summer 2011 • Construction in 2012 • Graham Swamp Trail Phase II • Under design • Construction pending funding

  22. Belle Terre Parkway 4-Laning • Completed • Palm Harbor Parkway Extension • Under design • Pending right-of-way acquisition • Construction pending funding • Palm Coast Parkway 6-Laning • Under design • Construction 2012/2013 • Holland Park Renovation • Under design • Construction pending funding

  23. Community Development Software • To be completed in summer 2011 • Longs Landing • Contract for design to Council in June 2011 • Construction pending funding • Wellfield and Wells • Water Plant #3 wellfield to be completed in fall 2011 • Water Plant #2 well completed

  24. Water Treatment Plant #2 upgrades • Out with RFQ for engineering design services • Wastewater Treatment Plant #1 upgrades • Under design • Construction pending funding • Lift Stations and Pump Stations • Construction 2010 and summer 2011 • Old Kings Road pump station design completed • Force Mains • Whiteview construction 2011

  25. Wastewater Treatment Plant #2 • Under design • Construction pending need and funding • Rymfire Drive Multi-Use Path – Ralph Carter Park to Lehigh Trail • Under design • Construction to be completed in 2011 • Belle Terre Parkway Multi-Use Path – Phase III • Under design • Construction to be completed in 2011

  26. Whiteview Parkway Multi-Use Path – Phase II • Under design • Construction to be completed in 2011 • Belle Terre Parkway Multi-Use Path – Connection from Fire Station 25 to Town Center • Design complete • Construction to begin after issuance of SJRWMD permit • Construction to be completed in 2011 • Palm Harbor Multi-Use Path • Design-Build project • Out to bid • Design to begin in summer 2011 • Construction to be completed in 2012

  27. Gold Certified “Green City” with numerous green projects and awards • Approved 2 major Comp Plan amendments with associated DRI’s • Implemented electronic utility bills • Expanded our community events to 33 in 2010 • Completed renovation to the Dog Park and stabilized the parking lot at Holland Park • Established the Business Assistance Center

  28. Revamped Employee Health Insurance Program • Self-Insured • High deductible • Established employee health clinic • Launched our social media program with the theme of Discover Palm Coast