1 / 32

Reducing ERP Storage Cost

Reducing ERP Storage Cost. How Much Is Complexity Costing You?. This Year Alone, IT Complexity Will Cost Firms Worldwide Some $750 Billion ”. Tony Picardi, IDC. The Complexity of Heterogeneity. ServiceGuard. PolyServe. JFS2. ReiserFS. SVC. LVM. UFS. GPFS. Sun Cluster. MSCS. QFS.

kmonte
Télécharger la présentation

Reducing ERP Storage Cost

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reducing ERP Storage Cost

  2. How Much Is Complexity Costing You? • This Year Alone, IT ComplexityWill Cost Firms WorldwideSome $750 Billion” • Tony Picardi, IDC

  3. The Complexity of Heterogeneity ServiceGuard PolyServe JFS2 ReiserFS SVC LVM UFS GPFS Sun Cluster MSCS QFS SAM FS ASM DLM TrueCluster GeoSpan TOOLSNEEDED: ZFS Ext3 LDM SVM JFS SAN-FS HACMP SDS ClusterFrame EVM QFS OCFS 46 45 39 40 41 42 43 44 30 14 08 12 02 38 13 04 05 03 07 09 10 06 01 37 15 35 28 27 26 25 24 20 22 21 19 18 17 16 23 29 34 31 32 33 36 11 49 47 48 50+ TrueCopy MirrorView SnapShot SAN Copy MPxIO MPIO DoubleTake RepliStor SnapView Snap FlashCopy InstantImage HDLM PowerPath PPRC ShadowImage SRDF TimeFinder ShadowCopy SNDR SecurePath Data Replication Manager MirrorDisk -UX

  4. The Simplicity of Standardization TOOLSNEEDED: 1 Storage Foundation HA

  5. LEVERAGELOWER-COSTSTORAGE REDUCECOMPLEXITY SOFTWARECOST AVOIDANCE Servers Server Software Storage Software $20K $10K $5K Storage Reducing Cost in Your ERP Environment

  6. Without Symantec With Symantec $$$ $$ $ $ $ $ $ $ SFHA Replication Snapshots Clustering Replication Replication Multipathing VM FS Snapshots Snapshots Array Software Stack OS Software Stack Software Cost Avoidance VM FS Clustering Multipathing Array Software Stack OS Software Stack

  7. SNAPSHOTSON LOWER-COST STORAGE REPLICATIONBETWEEN DIS-SIMILAR ARRAYS TIERED STORAGE $ $ $ $ Stale Time Critical $20K Tier 1 Tier 2 $20K $8K $8K File System Leverage Lower-cost Storage

  8. Hardware cost Tier 1 data cost: ~$25/GB1 Tier 2 data cost: ~$7/GB1 Data volume: 10 TB Data growth: 20% annually Software cost (75% discount) TimeFinder: ~$150-185K2 SRDF/S: ~$125K-$160K2 15% annual maintenance Storage management labor cost $150,000 per FTE burdened3 1 FTEs per 10TB3 Server units 3 HP Superdome16s (12 CPU) 2 clustered in prod, 1 in test Software cost (50% discount) PowerPath: ~$20K+$3K/server2 HP MC OE: ~$5K / CPU2 SF Oracle HA: ~$100K+$22K/server SERVER STORAGE Assumptions • Gartner Group Research Note, Jan 2005 • IDC study for VERITAS, May 2005 • VERITAS Storage Management Consulting

  9. 1.2 2 1.2 3 1.2 1.2 9.8 x data set size Environment Without VERITAS Production OLAP / Batch Reporting Test Development ETL RAID-5 ReportingRAID-5 ReportingRAID-5 OLTP Mirrored OLTP Mirrored Backup DRRAID-5 Remote Site

  10. Year 1 Cost Without VERITAS

  11. 3 Year Cost Without VERITAS

  12. Environment With VERITAS Production OLAP / Batch Reporting Test Development ETL RAID-5 Reporting(Space-Optimized) Reporting(Space-Optimized) OLTP Mirrored OLTP Mirrored Eliminate 2 data sets (20%) 9.8 data sets Backup Move 3.4 data sets to lower-cost storage (35%) DRRAID-5 Remote Site

  13. Year 1 Cost With VERITAS

  14. 3 Year Summary Cost With VERITAS

  15. VERITAS 3 year direct cost savings: $550K Cost Saving Summary

  16. Thank You! Josh Kahn josh_kahn@Symantec.com (650) 527-1194

  17. APPENDIX Supporting Data

  18. 3 Year Cost Without VERITAS

  19. 3 Year Cost With VERITAS

  20. Determining which model to use… • THIS DECK INCLUDES TWO MODULES; CHOOSE ONE MODEL BASED ON THE SITUATION AT YOUR CUSTOMER • Model A is in the presentation by default. Evaluate model B and consider replacing model A with model B. • Use MODEL A when BOTH of the following are TRUE • Reports run from the ERP application are run against a full copy of the OLTP database exclusively for reports (not the OLAP repository). • There are enough server resources to run the reports and OLTP instance on the same server. • Otherwise, use MODEL B • To use the ROI model spreadsheet with MODEL B, update the “data set elimination value” to 0%, update the “movement to a lower tier” value to 45%, and reduce the total data volume to 8TB

  21. MODEL B

  22. Hardware cost Tier 1 data cost: ~$25/GB1 Tier 2 data cost: ~$7/GB1 Data volume: 10 TB Data growth: 20% annually Software cost (75% discount) TimeFinder: ~$150-185K2 SRDF/S: ~$125K-$160K2 15% annual maintenance Storage management labor cost $150,000 per FTE burdened3 1 FTEs per 10TB3 Server units 3 HP Superdome16s (12 CPU) 2 clustered in prod, 1 in test Software cost (50% discount) PowerPath: ~$20K+$3K/server2 HP MC OE: ~$5K/CPU2 SF Oracle HA: ~$100K+$22K/server SERVER STORAGE Assumptions • Gartner Group Research Note, Jan 2005 • IDC study for VERITAS, May 2005 • VERITAS Storage Management Consulting

  23. Environment Without VERITAS Production OLAP / Batch Reporting Test Development ETL RAID-5 OLTP Mirrored OLTP Mirrored 1.2 2 3 1.2 Backup DRRAID-5 7.4 x data set size Remote Site

  24. Year 1 Cost Without VERITAS

  25. 3 Year Cost Without VERITAS

  26. Environment With VERITAS Production OLAP / Batch Reporting Test Development ETL RAID-5 OLTP Mirrored OLTP Mirrored 7.4 data sets Move 3.4 data sets to lower-cost storage (45%) Backup DRRAID-5 Remote Site

  27. Year 1 Cost With VERITAS

  28. 3 Year Summary Cost With VERITAS

  29. VERITAS 3 year direct cost savings: $345K Cost Saving Summary

  30. APPENDIX Supporting Data

  31. 3 Year Cost Without VERITAS

  32. 3 Year Cost With VERITAS

More Related