1 / 14

Principal Investigator: Manuel D. Rossetti, Ph.D., P.E. Research Assistants: Ashish Achlerkar, Mohammad H. Al-Rif

CELDI Project. Evaluation of Segmentation Techniques for Spare Parts Inventory Management. Principal Investigator: Manuel D. Rossetti, Ph.D., P.E. Research Assistants: Ashish Achlerkar, Mohammad H. Al-Rifai, Vikram L. Desai Department of Industrial Engineering

konala
Télécharger la présentation

Principal Investigator: Manuel D. Rossetti, Ph.D., P.E. Research Assistants: Ashish Achlerkar, Mohammad H. Al-Rif

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CELDI Project Evaluation of Segmentation Techniques for Spare Parts Inventory Management Principal Investigator: Manuel D. Rossetti, Ph.D., P.E. Research Assistants: Ashish Achlerkar, Mohammad H. Al-Rifai, Vikram L. Desai Department of Industrial Engineering University of Arkansas, Fayetteville

  2. Overview • Introduction and Research Motivations • Research Objectives • Project Phase I • Model Description, • Results and Conclusions • Project Phase II • Research Contributions • Research Tools & Techniques • Research Methodology • Conclusions & Directions for Future Research

  3. WORKSHOP ECHELON-5 ECHELON-4 C-DEPOT ECHELON-3 BRIG - A BRIG - B ECHELON-2 BATA– A1 BATA-A2 BATA-B1 ECHELON-1 COMP-A11 COMP-A12 COMP-A21 COMP-B11 COMP-B12 Introduction & Research Motivations • Large complex Multi-Indentured, Multi-Echelon inventory systems • Large number and variety of spare parts • Stochastic nature of demand, lead-time • Availability of data that represent generic inventory systems A typical five-echelon inventory system structure

  4. ACWT Admin Lead Time (4 days) Supply Stock AIMD 4 - 7 days RTAT/EXREP Resupply Repair BCM (19/15 days) BCM Rate 41% Retrograde (21 days) Wholesale Stock $ Attrition Replenishment (12-24 Months) AWM Depot RTAT (45 days) Pack & Receipt (4 days) (Attrition) Introduction & Motivations • Computational time, system costs, and management convenience • Selecting inventory control policy • Conventional grouping techniques & Inventory systems • Need to provide differentiated service to spare parts depending upon their importance for the overall supply chain goals Reference: Cdr.Ackart presentation slides Representative example of a Multi-echelon inventory system

  5. Research Objectives • Develop a Multi-Echelon data generation mechanism to generate a data set that represents a generic multi-echelon inventory systems • Develop a backorder Multi-Echelon, Multi-Indenture optimization model • Develop a Multi-echelon, Multi-Indenture inventory segmentation methodology that reduces computational time, inventory investment and increases management convenience • Implement the inventory segmentation methodology and use the backorder model to set inventory control policy parameters. • Provide general recommendations for generic inventory segmentation and control strategies • Provide general guidance for extending the Multi-Echelon, Multi-Indenture segmentation methodology to: • A repairable spare parts case • Non identical-retailer case

  6. Phase IOverview • In this phase, a single echelon, single indenture inventory segmentation methodologies are developed to provide an alternative to conventional inventory segmentation techniques, e.g. ABC: • Multi-Item Group Policies (MIGP) • In this policy a large number of items are reduced into small number of groups. • A generic group statistics for each variable are calculated • The backorder model is used to set up generic group inventory policy parameters, while trading off between groups • Grouped Multi-Item Group Policies (GMIIP) • In this policy a large number of items are also reduced into small number of groups. • The backorder model is used to set up inventory policy parameters for each item inside the groups without trading off between groups

  7. Phase IContributions • The items were clustered using the Unweighted Pair Method Arithmetic Averages UPGMA method • Multi-product backorder inventory model (Hopp and Spearman, 2001) was used to calculate inventory control policies for grouped and ungrouped datasets • Developed and automated a data-generation mechanism to simulate datasets for different types of inventory systems • Evaluated different inventory segmentation techniques using experimental design • Provided general recommendations for inventory segmentation in multi-indentured, multi-echelon inventory systems

  8. Phase IResults

  9. Phase II:Research Contributions • Develop a backorder Multi-Echelon, Multi-Indenture optimization model, that sets inventory control policy parameters • We developed the following backorder Multi-Echelon, Multi-Item optimization model that uses (R, Q) inventory policy at all echelons: • Our objective function is to minimize total inventory investment at both echelons subject to the following constraints: • We represent the above model mathematically as follows:

  10. Phase II:Research Contributions • In order to solve the above model we decomposed it into two levels, the warehouse and the retailer levels: • The warehouse level: • The retailer level:

  11. Phase II:Research Contributions • Develop data generation mechanism that generates data sets for generic inventory systems. • Investigate the applicability of available clustering techniques on inventory systems • Develop multi-echelon, multi-indenture inventory segmentation methodologies • Provide general recommendations for generic inventory segmentation and control strategies

  12. Phase II:Research Tools & Techniques • Clustering techniques: • Unweighted Pair Method Using Arithmetic Averages (UPGMA) • Nearest Neighbor • Inventory control model: • (R, Q) policy setting policy • Analytical models for calculating performance metrics • Heuristics • We are planning on using JAVA language to implement: • backorder Multi-Echelon, Multi-Indenture optimization model • data generation mechanism • SAS & MINITAB statistical analysis software's: • Implementing the clustering technique using SAS • Analyze the results using both SAS & MINITAB • Microsoft tools • Microsoft ACCESS to store and call data sets • Microsoft EXCEL to implement

  13. Phase II:Research Methodology • Build a data generation mechanism & generate data set that represent generic Multi-Echelon, Multi-Indenture inventory systems • Implement a clustering algorithm and use it to reduce large number of items into groups of items that characterized by: • A maximum between groups variance for each variable, • Minimum within groups variance for each variable, and • Limited number of groups • Build a backorder multi-echelon, multi-indenture optimization model • Develop a simple heuristics to approximate exact model • Implement the model in JAVA • Use the model to set up items and groups inventory policies • Experimental design and analysis • Investigates techniques to extend the segmentation methodologies to: • A repairable spare parts case • Non identical-retailer case

  14. Phase II:Conclusions & Directions for Future Research • Large multi-echelons, multi-indenture inventory systems usually consists of hundreds of thousands of items • Calculating inventory policy for each item is a computational burden that necessitates the need for: • More efficient policy setting techniques that reduce computational time, • Improves the ability of item managers to more effectively manage the supply chain • Inventory segmentation is a prominent way to overcome these problems • Direction for future research to extend inventory segmentation methodology to optimize and cluster at the same time.

More Related