DFMC

DFMC. Work Plan Update. Outline. Background / Purpose Task Progress Review Discussion areas. Background and Purpose. IWG has identified the need for a DFMC Definition Document outlining a requirements concept for Dual Frequency Multi-Constellation (DFMC) SBAS

kura
Télécharger la présentation

DFMC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DFMC Work Plan Update

  2. Outline • Background / Purpose • Task Progress Review • Discussion areas

  3. Background and Purpose • IWG has identified the need for a DFMC Definition Document outlining a requirements concept for Dual Frequency Multi-Constellation (DFMC) SBAS • A draft work plan to develop this document was presented at Ottawa 2012 (IWG-23) • Presented again at IWG-24 • This work plan status update • Identifies efforts in progress • Should assess progress based on presentations • Identifies areas with little to no effort

  4. Tasks • Operational Concept • Operational Goals and Services • GEO Selection and Transition • Reversionary Modes • Identify Benefits • System Requirements • Interchangeable Satellites • Safety Strategy • Avionics Design Constraints • Interface Definition • Interface Requirements • Interface Control Document • Definition Document

  5. Operational Goals and Services • Objectives • Identify minimum target operations and supporting services • Propose service classification schemes for coordination with standards bodies • Status • Initial proposed operational targets discussed at IWG 23. Documented in Work Plan Section 2 • Fairly well documented in Definition Document outline • Contains no new services or operations beyond current DO-229 • Need to update if there are specific changes for ADS-B or TBO

  6. GEO Selection and Transition • Objectives • Enable SBAS interoperability when transition between different operations, GEO coverage volumes, SBAS service volumes, international airspace and state airspace. • Status • Briefing and white paper available on options provided at IWG-26 (Feb 2014) • Requires IWG discussion/guidance on narrowing options • Request comments by April 30, 2014 • Can develop specific recommended requirements based on SBAS selection method • White paper 2-4 months after decision on selection method

  7. Reversionary Modes • Objectives • Identify minimum required avionics modes and supporting navigational services to support preferred fallback strategy and minimum operations. • Status • Briefing prepared by MITRE for IWG 24 • ESA brief (IWG 26) and white paper (April/May 2014) • Deliverables

  8. Identify Benefits • Objectives • Identify benefits for ANSP and avionics manufacturers • Status • No definite plan to address • Any interest, commitment from new States • Support for SBAS reference stations • Approval of SBAS service based on dual-frequency

  9. Interchangeable Requirements • Objectives • Identify technical issues necessary to support this capability • Derive requirements necessary to mitigate technical issues • Identify and quantify any resulting technical risks associated with this capability and the derived requirements. • Status • ESA Position Computation Equations • Definition of Inter System Issues (Geodetic References, Time References, Inter System Bias) • April/May input for DFMC Definition Document

  10. Safety Strategy • Objectives • Explain high level safety strategy and clearly identify subsystem safety objectives (e.g. integrity and continuity performance targets) • Status • No drastic change from current SBAS standards on approach to safety (e.g. not reallocation of integrity between ground and airborne subsystems) • ESA Protection Level Calculations • Brief at IWG-26, April/May input for DFMC Definition Document • Threat list or modification of Safety Strategy effort not underway • Propose using threat listed in ARAIM paper (see additional briefing)

  11. Avionics Design Constraints • Objectives • Identify key minimum design constraints which avionics must comply with to enable DFMC concept • Status • Briefed Signal Quality Monitoring and recommended correlation requirements (IWG-25, RTCA Oct 2013) • ESA working aviation error budgets

  12. Interface Requirement • Objectives • Develop interface requirements • Status • Reached consensus on ICD changes • Need to document signal format changes and accompanying requirements • E.g. propose redlines to DO-229D, Appendix A which describes current signal specification

  13. Interface Control Document • Objectives • Develop the message structure for DFMC GEO L1 and L5 SIS • Status • Reached consensus on ICD changes – Dec 2013 • Briefed at IWG 26 • Working on updated ICD • Recall previous SiS, transport layer effort

  14. Definition Document • Objectives • Identify required Definition Document content and assign resources • Maintain Definition Document and populate with information when available • Status • Initial outline drafted. Briefing prepared by FAA for IWG 24. • Updated expected following white paper receipt April/May 2014 • Deliverables

  15. Discussion Areas • Benefits for Dual-Frequency SBAS • Benefit of optional L5 ionosphere grid broadcast • Safety strategy • Threat list / threat identification • Effort required if desire to support operations more demanding than LPV-200 • Interface Requirements Document

  16. Summary • Review progress of work plan • Provided updates based on presentation at IWG 26 • Identified work plan topics at risk • Discussed path forward • Please provide comments to • joseph.ctr.dennis@faa.gov • jason.burns@faa.gov