SlideServe
Menu
Préférences
© SlideServe · v2026

NRO-WG Report: Number Optimization Recommendations for NANP Exhaust Projections

kwalker avatar
6 diapositives · 103 Views · Jan 05, 2020

Review of assumptions, sensitivity analysis on wireless inclusion, California and Illinois matrix updates. Recommendations on delaying ITN implementation and COCUS requirements. Meeting schedule provided.

NRO-WG Report: Number Optimization Recommendations for NANP Exhaust Projections - slide 1
01 / 6NRO-WG Report: Number Optimization Recommendations for NANP Exhaust Projections
1 / 17

Télécharger la présentation

NRO-WG Report: Number Optimization Recommendations for NANP Exhaust Projections
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Number Resource Optimization Working Group Report to NANCOctober 17-18, 2000Brian Baldwin, SBCBeth O’Donnell, Cox CommunicationsEleanor Willis-Camara, Winstar CommunicationsCo-Chairs

  2. NANP Exhaust Projections • Pursuant to recent instructions from NANC, the NRO-WG reviewed and discussed existing assumptions with NANPA. • No new assumptions were drafted, but will be continually revisited as new data is gathered. • Discussed sensitivity analysis of impact of wireless inclusion in pooling.

  3. Pooling • California and Illinois matrices will be updated in January. • Additional information will be reported as it becomes available.

  4. ITN Report • Reviewed and affirmed October 1998 report. • Prepared new report and recommendation based on review of earlier report and new information. • It is too soon to implement ITN. • RECOMMENDATION: Implementation of ITN should be delayed until results of thousands block pooling are more clear and other less disruptive number optimization methods are investigated. • Forwarded recommendation to NANC Chair. .

  5. COCUS (NRUF) Requirements Document • Status of Document: NRO-WG will present final Requirements document to NANC at the November meeting. • COCUS report goes to NANPA and PA in areas where SPs are participating in pooling. • NRO-WG assumed that numbering resources will be withheld from SPs that have not submitted COCUS report to NANPA and PA. • NRO-WG assumed that PA will perform reasonableness tests for pooled NPAs as described in the COCUS Requirements Document. • NRO-WG forwards to NOWG the obligation to draft performance survey on COCUS.

  6. NRO-WG 2000 MEETING SCHEDULE Conference call times are Eastern; face-to-face meetings are local time. Oct 26 Conference call 1pm-4pm 800-862-1270, PIN 60022352 Nov 9 Face-to-face meeting 8:30am-4pm Washington, DC (Breidenbaugh/ISTA host) Nov 16 Conference call 1pm-4pm O’Donnell/Cox (if needed Meeting dates are subject to change depending on any new work that may be assigned to NRO-WG by the NANC.